男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影

Aquatics Center

Updated: 2012-07-19 10:17:35

(london2012.com)

  Comments() Print Mail Large Medium  Small 分享按鈕 0
Aquatics Center

Sport: Diving, Modern Pentathlon, Swimming, Synchronised Swimming

Designed by internationally acclaimed architect Zaha Hadid, the breathtaking Aquatics Center is one of the permanent venues specially constructed for London 2012.

It forms part of the gateway to the Olympic Park – more than two-thirds of spectators will enter the Park at the south-east corner via a bridge that forms part of the venue’s roof.

The design and build

With a capacity of 17,500, the Aquatics Center’s spectacular wave-like roof is 160m long and up to 80m wide – giving it a longer single span than Heathrow Terminal 5.

The venue features a 50m competition pool, a 25m competition diving pool, a 50m warm-up pool and a ‘dry’ warm-up area for divers. The Water Polo competition is being hosted next door in the temporary Water Polo Arena

Construction on the venue began in July 2008 and was completed in July 2011.

The venue’s roof proved to be one of the most complex engineering challenges of the Olympic Park big build. Its skeletal structure rests on just two concrete supports at the northern end of the building and a supporting ‘wall’ at its southern end. This steel framework was initially constructed on temporary supports, before the entire 3,000-tonne structure was lifted up 1.3m in a single movement and successfully placed back down on to its permanent concrete supports.

Work began on the inside of the venue once the roof was in position. The three pools were dug out, lined, filled with water and tested, before they were fitted with more than 180,000 tiles.

After the Games

The Aquatics Center will be transformed into a facility for the local community, clubs and schools, as well as elite swimmers, attracting an anticipated 800,000 visitors a year. All the pools have moveable booms and floors to create different depths and pool sizes, so it can be used by swimmers of all abilities and experience. After the Games, the venue’s operator after the Games will be Greenwich Leisure Limited

The two temporary wings will be removed – reducing its capacity to 2,500 – although it will be possible to increase the venue capacity for major competitions.

The venue will also feature a creche, family-friendly changing facilities and a cafe, alongside a new public plaza in front of the building.

 

Medal Count

 
1 46 29 29
2 38 27 22
3 29 17 19
4 24 25 33
5 13 8 7
6 11 19 14

Watch the Future of Olympic Sports

SUPERBODIES 2012:
Soccer
Click for HD

Most Viewed

Gold medal moments

Age not a problem for Olympic dreams

Olympic moments to remember

Beijing Olympics just keeps on giving

Against the Olympic spirit

Olympic fashion tips

Taking success overseas

more

Competition Schedule

...
...
主站蜘蛛池模板: 富川| 凤阳县| 同德县| 塔城市| 玉溪市| 福安市| 西充县| 迁西县| 红安县| 富平县| 大埔区| 大化| 沁水县| 长兴县| 永安市| 茶陵县| 嘉祥县| 阳东县| 田阳县| 石渠县| 巴楚县| 百色市| 台州市| 宣化县| 工布江达县| 白河县| 梓潼县| 江阴市| 石屏县| 宁安市| 巴青县| 翼城县| 宜宾市| 墨竹工卡县| 潜山县| 九江市| 嘉祥县| 襄城县| 闽侯县| 满城县| 城步| 凤庆县| 武胜县| 瑞金市| 乐清市| 特克斯县| 洱源县| 鄂伦春自治旗| 新巴尔虎右旗| 叶城县| 马龙县| 桦南县| 普宁市| 孟村| 沁阳市| 登封市| 衡山县| 临洮县| 泽库县| 启东市| 福清市| 永丰县| 漳州市| 绥滨县| 平阳县| 五台县| 江达县| 偃师市| 隆化县| 邛崃市| 滕州市| 元江| 日照市| 玛纳斯县| 鱼台县| 酒泉市| 镶黄旗| 正阳县| 曲松县| 康马县| 阿克陶县| 鹿泉市|