男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Global EditionASIA 中文雙語Fran?ais
Business
Home / Business / World Economic Forum

Black gold capacity cuts will not destabilize market

By Yang Ziman | China Daily | Updated: 2017-01-16 10:35
Share
Share - WeChat

China will attempt to keep the coal market stable while continuing to shed capacity this year, according to the National Development and Reform Commission.

There are five measures the country will take to bring this about: flexible work days, replacing the existing outdated capacity with highly efficient capacity, maximum and minimum stock, mid and long-term contract and price management mechanism.

Capacity reduction remains high on the agenda though the goal in 2016-reduction of 250 million metric tons-was reached before the end of the year. The national plan for the coal industry for 2016-20 stipulates that approximately 800 million tons of capacity must be trimmed every year.

A 276-working-day restriction must be strictly observed. Yet, in times of rising demand, this restriction could be easily lifted temporarily, said Lian Weiliang, deputy director of the National Development and Reform Commission.

There is roughly 600 million tons' production in 276 to 330 work days. For instance, as coal demand rises in winter, some coal producers have been allowed to operate between 276 and 330 work days until the end of the heating season.

Wei Wei, an analyst at Pingan Securities Co Ltd, said in the next few years, coal demand would not rise significantly but remain stable. "It's doomed to fail if coal companies expect to win the market by expanding scale and increasing prices," Wei said.

Coal consumption had decreased by 2.9 and 3.7 percent year-on-year in 2014 and 2015 respectively. For coal mines under construction, the key is to replace low-efficiency capacity with high-efficiency capacity, according to the NDRC.

According to a report by Haitong Securities Co Ltd, by the end of 2015, active coal capacity was 3.9 billion tons. Meanwhile, 1.5 billion tons' capacity is being built, of which 800 million tons are illegal.

The report said that the 800 million tons of illegal capacity will be eliminated. The rest of the 700 million capacity under construction will be replaced by high-efficiency capacity, which will cut down the capacity by roughly 20 percent.

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
CLOSE
 
主站蜘蛛池模板: 喀喇| 衢州市| 马龙县| 陆河县| 岳池县| 图木舒克市| 章丘市| 精河县| 崇阳县| 辉县市| 灵武市| 大宁县| 宜川县| 竹北市| 江达县| 容城县| 文水县| 巴林右旗| 龙南县| 磴口县| 凤山县| 阿拉善左旗| 霍林郭勒市| 同德县| 东港市| 济阳县| 博客| 大关县| 竹北市| 兰西县| 齐齐哈尔市| 泰兴市| 晋州市| 偏关县| 铁岭县| 洛浦县| 龙川县| 肇源县| 红桥区| 宝兴县| 昆山市| 博客| 枣庄市| 台北县| 上犹县| 鞍山市| 乾安县| 邵东县| 乐亭县| 祁连县| 灵川县| 正蓝旗| 竹北市| 达州市| 揭西县| 鸡西市| 昭通市| 客服| 景谷| 阿尔山市| 武隆县| 榕江县| 离岛区| 南郑县| 宜君县| 军事| 蒙自县| 中山市| 龙井市| 克东县| 县级市| 新龙县| 新巴尔虎右旗| 方正县| 潮安县| 临武县| 德钦县| 邮箱| 普格县| 湘潭市| 日土县| 襄城县|