男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Global EditionASIA 中文雙語Fran?ais
World
Home / World / Asia-Pacific

China-Laos railway tunnel completed 43 days ahead of schedule

Xinhua | Updated: 2019-11-18 14:12
Share
Share - WeChat
The last piece of rock was crushed in the 1,001-meter-long Houay Han No 1 Tunnel of China-Laos railway on Sunday. [Photo/Xinhua]

A Key tunnel of China-Laos railway has been drilled through by China Railway No 8 Engineering Group (CREC-8) near the ancient Lao capital of Luang Prabang, some 220 km north of capital Vientiane.

With the roar of the excavator, the last piece of rock was crushed in the 1,001-meter-long Houay Han No 1 Tunnel of China-Laos railway on Sunday, and the completion was 43 days ahead of schedule.

The Houay Han No 1 Tunnel is located in the mountainous northern Laos with few population and tough geographical conditions. Likewise, the roads to the construction sites are rugged, which making the transportation in the rainy seasons especially difficult.

The first 564 meters of the tunnel from the entrance are in double lines, since they will be parts of a future railway station, while the rest is built as a single line tunnel.

The China-Laos railway is harvesting fruitful achievements after its construction commenced three years ago, with many tunnel drilled through recently.

The 4,585-meter-long Ban Ka No 1 Tunnel near Luang Prabang was drilled through on Nov 8 by the CREC-8, while the Boten Tunnel, the first major tunnel over 5,000 meters along the China-Laos railway was drilled through in March by China Railway No 5 Engineering Group (CREC-5).

Xinhua is informed that the 2,600-meter-long Houay Han No 3 is to be bored through on Tuesday, while the longest tunnel of the China-Laos railway, the 9,384-meter-long Ban Sen Tunnel is expected to be completed by the end of this year.

The China-Laos railway has holed through over 40 tunnels so far, out of its 76 tunnels with total length of 198 km.

The China-Laos Railway is a strategic docking project between the China-proposed Belt and Road Initiative and Laos' strategy to convert from a landlocked country to a land-linked hub.

The 414.332-km railway, with 198-km tunnels and 62-km bridges, will run from Boten border gate in northern Laos, bordering China, to Vientiane with an operating speed of 160 km per hour.

The electrified passenger and cargo railway is built with the full application of Chinese management and technical standards.

The project started in December 2016 and is scheduled to be completed and opened to traffic in December 2021.

Most Viewed in 24 Hours
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 额济纳旗| 东丽区| 佛冈县| 随州市| 读书| 和平区| 延寿县| 太仓市| 泊头市| 四平市| 邯郸市| 仁化县| 禹州市| 阿图什市| 惠东县| 浪卡子县| 广河县| 长春市| 平陆县| 洮南市| 长治市| 原平市| 建湖县| 左云县| 西林县| 于都县| 梁平县| 新宾| 平江县| 金秀| 喀喇沁旗| 松原市| 乌鲁木齐市| 长岛县| 鱼台县| 邵东县| 泉州市| 衡阳县| 施甸县| 宜君县| 沂南县| 景泰县| 海阳市| 葫芦岛市| 定日县| 海兴县| 隆德县| 玉溪市| 景泰县| 子洲县| 农安县| 晋州市| 磐石市| 六枝特区| 瑞丽市| 肥东县| 乌拉特前旗| 三门县| 普宁市| 五大连池市| 陆良县| 东乌珠穆沁旗| 鄄城县| 兴安盟| 无为县| 灌阳县| 西华县| 会理县| 龙川县| 资溪县| 莎车县| 常熟市| 吉安县| 高碑店市| 宣汉县| 梅河口市| 颍上县| 东乡县| 洞头县| 当涂县| 江津市| 合江县|