男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Global EditionASIA 中文雙語Fran?ais
China
Home / China / Deputies and Members

Construction continues on Sichuan-Tibet Railway

By LUO WANGSHU | chinadaily.com.cn | Updated: 2022-03-09 16:58
Share
Share - WeChat
A Fuxing bullet train runs on the Lhasa-Nyingchi railway in the Tibet autonomous region on June 24, 2021. Jiao Hongtao/For China Daily

Construction on the third section of a high-profile railway connecting Sichuan province and the Tibet autonomous region is ongoing, a political adviser told Xinhua News Agency recently.

"The Sichuan-Tibet Railway is a strategic project with many challenges, including a complicated geological structure, which will make construct extremely difficult, and a sensitive environment in the region," said Lu Chunfang, an academician of the Chinese Academy of Engineering.

Lu is also a member of the Chinese People's Political Consultative Conference National Committee and general director of the Qinghai-Tibet Railway, the first railway in Tibet.

Lu and his team has carried out research on the Sichuan-Tibet railway, proposing more than 100 technical suggestions, the Science and Technology Daily reported.

Upon completion, the Sichuan-Tibet Railway will cross eight mountains, and more than 93 percent of the line will consist of bridges and tunnels, Lu said.

The line will include six tunnels stretching more than 30 kilometers, with the longest tunnel 42 km, he said, adding that the tunnels will not only be long, but also buried deep underground.

"The deeper the tunnel goes underground, the more pressure it puts on the rocks," he explained, which will create a higher risk of collapse.

Building the bridges will also be problematic.

"The bridge that will pass over the Nujiang River will be 610 meters tall, which is nearly the same height of Shanghai Tower, China's tallest building (632 m tall)," he added.

Tibet's sensitive environment is another issue. The line passes 75 environmentally sensitive points, including natural reserves and water conservation areas, all posing challenges to construction, Lu added.

The 1,838-km Sichuan-Tibet Railway project is divided into three parts.

Two parts have been completed and are currently running. The Chengdu-Ya'an section in Sichuan opened in 2018, and the Lhasa-Nyingchi line began operating last year.

The third and most challenging section, linking Sichuan and Tibet between Ya'an and Nyingchi, began in 2020.

The date of the railway's planned completion has yet to be revealed.

Upon completion, the railway will be the second to link Tibet with the rest of the country, following the Qinghai-Tibet Railway, which opened in 2006.

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 柞水县| 福清市| 尉犁县| 东乌珠穆沁旗| 平阴县| 长海县| 陆丰市| 海淀区| 桐梓县| 三门县| 腾冲县| 宁国市| 太谷县| 肇东市| 汕尾市| 潜山县| 西畴县| 河津市| 陆河县| 定西市| 三亚市| 鄯善县| 嘉荫县| 关岭| 马边| 福安市| 安徽省| 东台市| 常山县| 彭州市| 和林格尔县| 台东市| 綦江县| 蒙自县| 银川市| 新蔡县| 黑龙江省| 和硕县| 泗洪县| 磐安县| 泰兴市| 万安县| 大冶市| 鱼台县| 逊克县| 江孜县| 襄垣县| 莱州市| 库尔勒市| 惠安县| 渑池县| 老河口市| 基隆市| 资兴市| 甘南县| 玉龙| 衡阳市| 东乡县| 炉霍县| 延庆县| 芜湖县| 罗平县| 卓资县| 新密市| 万山特区| 唐山市| 阿巴嘎旗| 岱山县| 江阴市| 陇南市| 望谟县| 上杭县| 金秀| 广安市| 大田县| 潞西市| 奈曼旗| 保靖县| 延川县| 合水县| 永善县| 建始县|