男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Global EditionASIA 中文雙語Fran?ais
Sports
Home / Sports / Olympic Games

Italian job: Controversial track slides into action

Completed in record time, Olympic sliding center gets put through its paces

Updated: 2025-03-27 09:55
Share
Share - WeChat
An aerial view of the Cortina Sliding Center, the venue for the bobsleigh, luge and skeleton events at the Milano-Cortina 2026 Winter Olympics, in Cortina d'Ampezzo, Italy, on Tuesday. Dozens of athletes will carry out a series of test runs over the course of the week. AP

CORTINA D'AMPEZZO, Italy — After many setbacks, controversies and only 13 months of construction, a feat hailed as "an Italian miracle", the sliding track for the 2026 Milano-Cortina Winter Olympic Games was inaugurated on Tuesday.

Italy's Mattia Gaspari may not be among the gold medalists in the Dolomites next year, but the 31-year-old skeleton specialist has already made history.

Gaspari was the first to race down the much-discussed Cortina track as part of its pre-homologation process to ensure its safety for competitors.

Over the course of the week, dozens of bobsleigh, luge and skeleton athletes will carry out a series of test runs on the 1.75-kilometer track and its 16 turns, where speeds can hit 140km/h.

Run times are estimated to be around 55-60 seconds.

When construction work began in February 2024, late for a project of this scale and complexity, many doubted that it could be completed in time for the Olympics, which take place from Feb 6 to 22.

Not Matteo Salvini, the second-in-command and minister of Infrastructure and Transport in Giorgia Meloni's hard-right government.

Salvini relaunched the project at the end of 2023, when organizers wanted to relocate the 12 bobsleigh, luge and skeleton events to neighboring Austria or Switzerland because of the lack of a functioning track in Italy.

"I want to thank the workers who came from all over the world to Cortina to create this miracle that represents Italy so well," the Italian deputy premier said.

"Where there's a will, there's a way. Italian engineers and architects are without equal in the world," said Salvini, comparing the sliding track to Filippo Brunelleschi's famed 15th-century dome over Florence Cathedral.

"History is full of Italians who dared. At the time, it was said of this dome that it would never last. Six centuries later, it's still there. This will also apply to those who say these Olympic Games are too expensive."

1 2 Next   >>|

Most Popular

Highlights

What's Hot
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 佛山市| 余江县| 武定县| 庆阳市| 咸宁市| 哈巴河县| 巫山县| 怀安县| 黑水县| 邻水| 巴里| 固安县| 留坝县| 马龙县| 莲花县| 若尔盖县| 如皋市| 富民县| 马山县| 措美县| 阳新县| 荃湾区| 松江区| 镇远县| 道孚县| 济南市| 长垣县| 成都市| 泸定县| 宜昌市| 双鸭山市| 河曲县| 沙雅县| 虞城县| 上虞市| 桃源县| 绥德县| 都江堰市| 南京市| 右玉县| 宝清县| 呈贡县| 孙吴县| 额尔古纳市| 威海市| 玉田县| 水城县| 泸西县| 古丈县| 湘乡市| 内黄县| 手游| 汾阳市| 武隆县| 类乌齐县| 盐池县| 温州市| 察雅县| 日照市| 军事| 古田县| 师宗县| 洞头县| 浏阳市| 克拉玛依市| 柳州市| 普兰店市| 简阳市| 鄂托克前旗| 万安县| 年辖:市辖区| 东光县| 疏勒县| 苗栗县| 洪雅县| 永福县| 玉屏| 台前县| 措美县| 淮安市| 固阳县| 孙吴县|