|
BIZCHINA> Top Biz News
![]() |
|
Stimulus funding is flowing toward sewage upgrades
By Li Jing (China Daily)
Updated: 2009-06-26 07:50 Green projects are among the major beneficiaries of the government's 4-trillion-yuan ($586 billion) stimulus package. Wan Bentai, chief engineer at the Ministry of Environmental Protection (MEP), said some 210 billion yuan will support environmental initiatives, including the construction of sewage and waste treatment facilities and improvements to energy-efficiency and ecology conservation. A total of 160 billion yuan will flow into pollution treatment projects aimed at protecting rivers and lakes. Work will benefit Huaihe, Haihe and Liaohe rivers, Taihu, Chaohu, and Dianchi lakes, as well as reservoir areas for the Three Gorges and Xiaolangdi hydro project on the Yellow River. Most of the investment will support sewage and waste treatment facilities, Wan said. Projects to reduce energy use and prevent industrial pollution will get 40 billion yuan, while the last 10 billion from the 210-billion will go to ecological conservation.
The beefed-up investment in green projects followed officials vowing to develop green industries as a new engine for economic growth. By the end of April, about 23 billion yuan from the stimulus package had been directed at energy conservation, emission control and environmental protection, according to the National Development and Reform Commission (NDRC). The latest report from the Ministry of Finance shows that between January and May, spending on environmental protection rose 93.5 percent over the period last year. Jinsha River work stalled
Wan confirmed the construction of two dams on the middle reaches of Jinsha River had been halted. Work on the Lulida and Longkaikou hydro-electric projects, which are owned by Huadian Power and Huaneng Power respectively and located in Lijiang, Yunnan province, began in January without the mandatory environment impact assessment. "MEP has sent an inspection team to the construction site," Wan said. "It found the two companies had already halted construction and workers had been withdrawn. People in charge of these projects from the two power companies have come to MEP to acknowledge their mistakes." The fate of the projects will be determined via an overall assessment being carried out by NDRC, MEP and the Ministry of Water Resources, Wan said. "Construction of the two hydro projects will only be resumed if they fit into the overall development plan for Jinsha River," Wan said. (For more biz stories, please visit Industries)
|
|||||
主站蜘蛛池模板: 宜黄县| 大丰市| 长沙市| 临沂市| 波密县| 沧州市| 垦利县| 读书| 邢台县| 建水县| 舞钢市| 六枝特区| 文成县| 贵港市| 江华| 嘉祥县| 惠东县| 邹平县| 温宿县| 安福县| 汝阳县| 嘉荫县| 静宁县| 潼关县| 德安县| 哈巴河县| 潼关县| 徐汇区| 吉首市| 黑龙江省| 资中县| 武安市| 垣曲县| 鄱阳县| 汕尾市| 平乡县| 武功县| 麦盖提县| 冀州市| 罗源县| 满洲里市| 连平县| 东乌珠穆沁旗| 蓬安县| 布拖县| 广宗县| 肇庆市| 札达县| 太保市| 漯河市| 永胜县| 晋州市| 星子县| 烟台市| 建瓯市| 富顺县| 大姚县| 中方县| 开原市| 双城市| 旅游| 武宣县| 太和县| 武清区| 三穗县| 来安县| 邓州市| 通渭县| 绍兴市| 广宁县| 澳门| 炎陵县| 乐清市| 蓝山县| 嘉鱼县| 九寨沟县| 凤阳县| 十堰市| 遂平县| 常州市| 沽源县| 离岛区|