男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影

InfoGraphic

Last track in place for high-speed train link

By Xin Dingding (China Daily)
Updated: 2010-11-16 13:47
Large Medium Small

Last track in place for high-speed train link

Workers lay the last track for the Beijing-Shanghai high-speed railway in Bengbu, Anhui province, on Monday. [Photo/China Daily] 

 

Journey between Shanghai and Beijing to be cut to four hours

BENGBU, Anhui -Track-laying work for the long-anticipated Beijing-Shanghai high-speed railway stood complete when Railways Minister Liu Zhijun tightened the line's last bolt on a windy Monday morning.

"The project has entered its last stage," Lu Chunfang, vice-minister of railways, said at a ceremony to celebrate the latest success in the city of Bengbu, situated in the center of the railway line.

Last track in place for high-speed train linkNew energies to lead copper growth
Related readings:
Last track in place for high-speed train link High-speed rail expands
Last track in place for high-speed train link Shanghai-Hangzhou high-speed railway begins operation
Last track in place for high-speed train link Whew! Can 500 km/h trains be used?
Last track in place for high-speed train link China begins research on faster high-speed trains
Since the project kicked off on April 18, 2008, some 135,000 workers have toiled hard to lay 1,318 km of high-quality tracks.

In the next few months, workers will race against time to install the railway's power supply, communications and signal systems, and carry out operation trials to test the line and trains to ensure the railway can open to traffic next year, Wang Yongping, spokesman of the Ministry of Railways, said.

"The Beijing-Shanghai high-speed railway incorporates China's latest high-speed railway technologies," he said.

The 1,318-km railway costs 220.94 billion yuan ($33.29 billion) in total.

"The core factor that can tell a country's high-speed railway technology is the speed," said Guo Zhiyong, deputy chief engineer of China Railway Siyuan Survey and Design Group Co Ltd, which is in charge of the line's design.

"The future trial operations on this line are expected to beat the speed record of 416.6 km per hour achieved by the Shanghai-Hangzhou railway on Sept 28. And its future operation speed will also exceed that of the current 350 km per hour," he said.

The ministry aims to slash the travel time between China's two largest cities to only four hours, down from the current 10 hours.

Last track in place for high-speed train link

Other technical highlights include engineers' innovations in tunnel design and construction that allow trains to encounter each other in the tunnel at a speed of 350 km per hour safely, and the world's first six-line high-speed railway bridge, the Dashengguan bridge in Nanjing, Jiangsu province, which spans 336 meters and allows trains to pass through at a speed of 300 km per hour.

The railway winds through seven provinces and municipalities along China's eastern coast, where one-fourth of the country's population lives, generating 40 percent of the country's GDP.

Along the way, there are 24 stops, including five major stations - Beijing South, Tianjin West, Jinan West, Nanjing South and Shanghai Hongqiao stations.

The new railway is expected to relieve the existing line of pressures from both passenger and cargo transport, said Wang Yongping.

For a long time, the railway department found it difficult to meet transportation demands along the line. Only 35 percent of the demand for cargo transportation could be met in the past, he said.

With the new rail line ready, the ministry estimates that it can ferry 80 million passengers in one direction annually. This will greatly enhance the railway transport capability between Beijing and Shanghai, as the existing railway will be used for cargo transport, he said.

China now leads the world with 7,431 km of high-speed railways in operation.

The country plans to build a high-speed railway network of 13,000 km by 2012. By then, passengers would be able to reach most provincial capital cities from Beijing in eight hours by train.

主站蜘蛛池模板: 永昌县| 博罗县| 巧家县| 泾阳县| 手机| 西畴县| 临高县| 比如县| 南漳县| 晋中市| 安岳县| 阿瓦提县| 黑河市| 白玉县| 保康县| 田林县| 德昌县| 淮北市| 昆山市| 天镇县| 固镇县| 天等县| 商洛市| 启东市| 壤塘县| 余干县| 莆田市| 靖江市| 太湖县| 泽州县| 古田县| 株洲县| 贵南县| 沛县| 巴马| 林芝县| 日土县| 高安市| 班玛县| 乌兰察布市| 星座| 榆社县| 修文县| 石林| 浑源县| 临泉县| 天等县| 松滋市| 曲阜市| 古田县| 益阳市| 湖南省| 德安县| 伊吾县| 余庆县| 福建省| 兴业县| 定西市| 始兴县| 桐梓县| 特克斯县| 滦南县| 囊谦县| 朔州市| 津南区| 陆河县| 大田县| 七台河市| 图们市| 锡林浩特市| 沙田区| 上高县| 乌鲁木齐县| 囊谦县| 石河子市| 长子县| 桦川县| 阳新县| 简阳市| 宁陵县| 焦作市| 塘沽区|