男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影

China nuclear targets to be cut in wake of Fukushima disaster

Updated: 2011-10-22 10:22

By James Pomfret and Leonora Walet (China Daily)

  Comments() Print Mail Large Medium  Small 分享按鈕 0

China nuclear targets to be cut in wake of Fukushima disaster

A nuclear power technology booth at an expo. China is scheduled to release a revised blueprint for its nuclear sector this year, with a new capacity target of 86 gigawatts by 2020. Nan Shan / for China Daily

Country is scheduled to release a revised blueprint for the industry

HONG KONG - China's nuclear capacity targets for 2020 are likely to be scaled down after the country imposed a moratorium on new-project approvals following the Fukushima disaster in Japan in March, industry officials said on Friday.

China is scheduled to release a revised blueprint for its nuclear sector this year, with many predicting a new 2020 target of 86 gigawatts (GW).

Capacity at the end of 2010 stood at 10.9 GW, but projects already under construction would have pushed the total up to 40 GW by as early as 2015, and China's bullish reactor builders even suggested a target of 100-120 GW was within reach.

But Beijing promised to "adjust and improve" its plans for the sector after an earthquake and tsunami devastated Japan's northeast coast and left the aging Fukushima Daiichi reactor complex on the brink of meltdown.

Li Yongjiang, vice-president of the China Nuclear Energy Association (CNEA), said on the sidelines of an industry conference in Hong Kong that new projects were likely to be resumed next year, but that the country had already lost a year of construction time.

"The 86-GW target was still a very tight target in the first place," he said, adding that the suspension had forced the delay of around 10 GW of new capacity this year.

"If we start from next year, we'll only be able to build 60 to 70 GW so we will definitely have to reduce (the target)," he said.

In March, the government ordered a nationwide inspection of existing plants and construction sites in order to allay public disquiet about the safety of nuclear power.

Areas of concern included the safety of the many "second-generation" reactors set to go into operation, the shortage of qualified safety and operational personnel, and the possible construction of nuclear projects in seismically vulnerable provinces such as Sichuan.

Officials have suggested that no new second-generation reactors will be approved, leaving the way clear for third-generation models designed by France's Areva SA and the US-based Westinghouse Electric Co, a subsidiary of Toshiba Corp.

Chinese officials have stressed throughout the inspection period that while the pace of development could be adjusted in the wake of Fukushima, plans for long-term expansion of capacity will remain intact.

"We should ensure the safety of nuclear energy before coming up with new projects," said Zhao Chengkun, vice-chairman of the CNEA.

"So, although we're kind of slowing down right now, I'm sure that once we overcome all our challenges we'll be able to develop further."

Senior energy officials have expressed concern that the current impasse will hurt China's long-term aim of becoming a global leader in the nuclear sector.

In August, the former head of the CNEA, Zhang Guobao, said that new industry policies had to be drawn up as soon as possible if the country was to avoid falling behind countries such as South Korea and Russia.

主站蜘蛛池模板: 长寿区| 莒南县| 高邑县| 诸暨市| 崇仁县| 遂溪县| 潍坊市| 玉屏| 合山市| 海阳市| 蒙自县| 商都县| 松滋市| 边坝县| 昌江| 张掖市| 肇源县| 恩施市| 江川县| 景泰县| 革吉县| 广河县| 额济纳旗| 泸西县| 巴南区| 明水县| 凌源市| 贺州市| 邻水| 晋城| 宁化县| 灌阳县| 扎赉特旗| 阿克苏市| 多伦县| 大庆市| 锡林浩特市| 鄢陵县| 大兴区| 峨山| 左贡县| 乡城县| 徐闻县| 舞钢市| 红原县| 韶山市| 北票市| 咸阳市| 新昌县| 会同县| 天峨县| 观塘区| 湘阴县| 龙井市| 郸城县| 阿勒泰市| 辽源市| 许昌市| 德昌县| 丽江市| 香港| 揭西县| 定日县| 阿拉尔市| 若尔盖县| 田东县| 抚远县| 满洲里市| 阿图什市| 永平县| 长泰县| 新营市| 泗洪县| 邯郸市| 双鸭山市| 舟曲县| 印江| 屏边| 赤峰市| 手机| 南宫市| 都安|