男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Make me your Homepage
left corner left corner
China Daily Website

Capital's subway system branches out

Updated: 2013-01-04 09:08
By Zheng Xin (China Daily)

Unprecedented construction of Beijing's gigantic underground transit network is expected to alleviate traffic problems that have been haunting the metropolis for decades, reports Zheng Xin.

Capital's subway system branches out

A woman takes photos at Nanluoguxiang Station on Line 6 on Sunday. The station's decoration features the traditional folk art of Beijing. Wei Xiaohao / for China Daily

The Beijing Subway has seen unprecedented construction in recent years, greatly easing traffic congestion in the Chinese capital.

Including a new line and extensions to lines, the city boasts a network of 15 lines, covering 11 districts, with 221 stations and 442 km of track.

Wang Renqiang, a leading project official of the subway's Line 6 project department of the China Railway Tunnel Group, said once everything is operational, the updated network will make it easier for people to get around and provide relief to transport services on the ground.

The Beijing Subway is the busiest on the Chinese mainland in terms of passenger volume, and the largest in terms of operational length.

It is estimated the total operational length of the Beijing system will reach 1,050 km by the end of 2020, with 30 lines and some 450 stations, according to the Beijing government.

The four new services, which started operating on Dec 30, are Line 6, which connects the east and west of the capital; an extension to Line 10, which will form the capital's second loop line once finished; an extension to Line 8, which connects the city center and northern suburbs; and an extension to Line 9 to serve Beijing West Railway Station.

Capital's subway system branches out

Line 6 will eventually be 52 km long and boast 32 stations, according to the Beijing Municipal Commission of Transport. This involves three phases, with the entire route becoming operational by the end of 2015.

The first phase is 30.4 km long, with 20 underground stations, while the second will cover another 12.4 km, with seven stations.

According to the commission, the government has so far invested about 18.4 billion yuan ($3 billion) in Line 6, with some 16.6 billion yuan going into the first phase.

Capital's subway system branches out

The first phase runs from Wuluju in Haidian district in the west of the capital to Caofang in Chaoyang district in the east. Trains can accommodate 1,960 passengers on a single trip, more than can be carried on a single trip on any of the capital's other subway lines.

It is also the fastest line on the system, with trains running at a maximum speed of 100 kph, compared to the current highest speed of 80 kph. Trains will take 48 minutes to travel the whole line.

One of the reasons for the speed is that stations are far apart, with the longest distance between two consecutive stations being four km.

In addition to its capacity and speed, Line 6 also features the deepest station on the system, with the connection to Dongsi Station on Line 5 being 34 meters underground.

The city's subway system is under considerable pressure, with serious overcrowding during rush hours, partly because of the ticket price of just 2 yuan (31 cents) regardless of the length of journey.

Contact the writer at zhengxin@chinadaily.com.cn

 
 
...
主站蜘蛛池模板: 萍乡市| 翁牛特旗| 东方市| 新竹县| 谷城县| 班玛县| 潞城市| 鄢陵县| 乳山市| 丹东市| 神池县| 萨嘎县| 昌邑市| 柳林县| 浙江省| 清新县| 永昌县| 辉南县| 南木林县| 富平县| 高要市| 博乐市| 定安县| 金寨县| 漳浦县| 庆城县| 任丘市| 中西区| 原平市| 澜沧| 海宁市| 旬阳县| 马关县| 沙雅县| 冀州市| 宁河县| 江北区| 河池市| 石台县| 榆林市| 格尔木市| 遂溪县| 南陵县| 扶沟县| 溧水县| 汶川县| 海门市| 和平区| 永新县| 沙湾县| 龙井市| 肇东市| 义马市| 黑河市| 蛟河市| 西乌| 夏河县| 蕉岭县| 德保县| 尚志市| 江达县| 布尔津县| 滨海县| 诸暨市| 亚东县| 包头市| 霍邱县| 襄樊市| 吉木乃县| 博客| 秦皇岛市| 桑日县| 建始县| 南部县| 安国市| 台北市| 定南县| 城固县| 万载县| 昭苏县| 桦南县| 吉首市|