男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
USEUROPEAFRICAASIA 中文雙語Fran?ais
Business
Home / Business / Industries

Nuclear unit goes online at Yangjiang

By Zheng Xin | China Daily | Updated: 2017-03-16 08:13

China's first nuclear unit constructed after the 2011 Fukushima accident in Japan was put into operation on Wednesday, after 168 hours of test operation, according to China General Nuclear Power Corp, the country's largest nuclear operator.

With construction beginning in November 2012, Unit 4 of the Yangjiang nuclear power plant, China's biggest nuclear power plant located in Guangdong province, has had a good safety record, said CGN, which is also the world's fifth-biggest nuclear operator with 19 nuclear power units in operation and an installed capacity of 20.38 gigawatts at the end of 2016.

After the Fukushima disaster, nuclear power unit construction was suspended in China and all nuclear plants under planning or construction were reviewed.

However, nuclear power generation in recent years, especially in the first two months of the year, had continued to see sharp growth, said Joseph Jacobelli, a senior analyst with Asia utilities and infrastructure research at Bloomberg Intelligence.

China's nuclear energy developers will be commissioning many more reactors during the 13th Five-Year Plan (2016-20) as nuclear power is a key source of clean energy along with hydropower, he said.

"Installed nuclear capacity already more than doubled to 27.17 GW in the 12th Five-Year Plan (2011-15) and should double again by 2020 to 58 GW," said Jacobelli.

"Actual output from nuclear plants has also followed suit, with a 24.4 percent increase in 2016 alone."

The growth was coming from a low base with nuclear power accounting for just 3.6 percent of the total in 2016, he added.

Six units are planned for the Yangjiang plant, with Unit 1 entering commercial operation in March 2014, Units 2 and 3 in June 2015 and January 2016, respectively. And all six reactors will be put into operation by 2019, said the company.

The grid connection of Yangjiang's Unit 4 brings its total number of operational power reactors in operation to 20, with a combined installed capacity of more than 21.46 GW, said the company.

CGN's total annual nuclear on-grid power generation was roughly 115.58 billion kilowatt-hours in 2016, an increase of 30.8 percent year-on-year, which is equivalent to a reduction in coal consumption of 37 million metric tons and carbon dioxide emissions of 90 million tons and sulfur dioxide emissions of 880,000 tons, it said.

Most Viewed in 24 Hours
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 湘潭县| 通山县| 无棣县| 高碑店市| 老河口市| 双城市| 民权县| 榆林市| 驻马店市| 三原县| 寻甸| 日喀则市| 小金县| 甘南县| 霍林郭勒市| 交口县| 泽库县| 阿鲁科尔沁旗| 美姑县| 吉林省| 句容市| 翁牛特旗| 梁山县| 永兴县| 云浮市| 从化市| 宝应县| 泽普县| 玉屏| 北碚区| 扬中市| 本溪| 博白县| 海伦市| 屏东县| 桦川县| 茂名市| 平罗县| 固始县| 陇西县| 监利县| 青川县| 宜宾县| 新田县| 六盘水市| 禹城市| 深水埗区| 漯河市| 麻阳| 克山县| 鄯善县| 德州市| 南安市| 海城市| 福海县| 宣城市| 雅江县| 韶关市| 新蔡县| 太仓市| 都江堰市| 阜新| 鄂托克旗| 隆化县| 灵武市| 城市| 水城县| 中阳县| 资中县| 米脂县| 澳门| 鄱阳县| 通许县| 泸州市| 洛川县| 肇庆市| 顺昌县| 新安县| 东海县| 长顺县| 白沙| 宝清县|