男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Make me your Homepage
left corner left corner
China Daily Website

Capital's subway system branches out

Updated: 2013-01-04 09:08
By Zheng Xin (China Daily)

Unprecedented construction of Beijing's gigantic underground transit network is expected to alleviate traffic problems that have been haunting the metropolis for decades, reports Zheng Xin.

Capital's subway system branches out

A woman takes photos at Nanluoguxiang Station on Line 6 on Sunday. The station's decoration features the traditional folk art of Beijing. Wei Xiaohao / for China Daily

The Beijing Subway has seen unprecedented construction in recent years, greatly easing traffic congestion in the Chinese capital.

Including a new line and extensions to lines, the city boasts a network of 15 lines, covering 11 districts, with 221 stations and 442 km of track.

Wang Renqiang, a leading project official of the subway's Line 6 project department of the China Railway Tunnel Group, said once everything is operational, the updated network will make it easier for people to get around and provide relief to transport services on the ground.

The Beijing Subway is the busiest on the Chinese mainland in terms of passenger volume, and the largest in terms of operational length.

It is estimated the total operational length of the Beijing system will reach 1,050 km by the end of 2020, with 30 lines and some 450 stations, according to the Beijing government.

The four new services, which started operating on Dec 30, are Line 6, which connects the east and west of the capital; an extension to Line 10, which will form the capital's second loop line once finished; an extension to Line 8, which connects the city center and northern suburbs; and an extension to Line 9 to serve Beijing West Railway Station.

Capital's subway system branches out

Line 6 will eventually be 52 km long and boast 32 stations, according to the Beijing Municipal Commission of Transport. This involves three phases, with the entire route becoming operational by the end of 2015.

The first phase is 30.4 km long, with 20 underground stations, while the second will cover another 12.4 km, with seven stations.

According to the commission, the government has so far invested about 18.4 billion yuan ($3 billion) in Line 6, with some 16.6 billion yuan going into the first phase.

Capital's subway system branches out

The first phase runs from Wuluju in Haidian district in the west of the capital to Caofang in Chaoyang district in the east. Trains can accommodate 1,960 passengers on a single trip, more than can be carried on a single trip on any of the capital's other subway lines.

It is also the fastest line on the system, with trains running at a maximum speed of 100 kph, compared to the current highest speed of 80 kph. Trains will take 48 minutes to travel the whole line.

One of the reasons for the speed is that stations are far apart, with the longest distance between two consecutive stations being four km.

In addition to its capacity and speed, Line 6 also features the deepest station on the system, with the connection to Dongsi Station on Line 5 being 34 meters underground.

The city's subway system is under considerable pressure, with serious overcrowding during rush hours, partly because of the ticket price of just 2 yuan (31 cents) regardless of the length of journey.

Contact the writer at zhengxin@chinadaily.com.cn

 
 
...
主站蜘蛛池模板: 长春市| 内黄县| 梅河口市| 惠安县| 广安市| 龙川县| 洛南县| 双桥区| 乌审旗| 汉川市| 防城港市| 通州区| 烟台市| 连城县| 舞钢市| 溧水县| 陈巴尔虎旗| 瑞昌市| 黎川县| 奉贤区| 遵义市| 汉寿县| 三明市| 成武县| 武川县| 揭东县| 徐水县| 马尔康县| 渝北区| 垦利县| 兴化市| 永靖县| 鄂托克旗| 崇阳县| 铁岭县| 射洪县| 五莲县| 保定市| 彰化市| 寿光市| 泰顺县| 北碚区| 东城区| 万载县| 萨迦县| 友谊县| 应城市| 东光县| 繁峙县| 广平县| 惠安县| 普格县| 宁夏| 韶山市| 香格里拉县| 怀仁县| 泉州市| 九寨沟县| 盐津县| 新乡市| 凌源市| 河北省| 高要市| 正蓝旗| 高淳县| 郁南县| 清涧县| 廊坊市| 英超| 华宁县| 堆龙德庆县| 彭水| 庆城县| 嵩明县| 沂源县| 永宁县| 平顶山市| 临武县| 尼木县| 兴安县| 运城市| 鹤岗市|