男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
USEUROPEAFRICAASIA 中文雙語Fran?ais
Business
Home / Business / Industries

Eight nuclear reactors to be built this year

China Daily | Updated: 2017-02-23 07:29

Eight nuclear reactors to be built this year

Workers walk by the No 3 and No 4 power generation units of the Hongyanhe Nuclear Power Station in Wafangdian of Dalian city, Northeast China's Liaoning province, Sept 22, 2016. [Photo/Xinhua]

 

China plans to beef up its nuclear power sector in 2017, kicking off construction of eight reactors this year with installed capacity totaling 9.9 gigawatts, the National Energy Administration said.

The NEA has issued new guidelines on nuclear power development.

These include Unit 1 at the Sanmen nuclear power plant in Zhejiang province, Unit 4 at the Fuqing plant in Fujian province, Unit 4 at the Yangjiang nuclear power plant in Guangdong province and Unit 1 of the Taishan plant in Guangdong, adding 6 GW of nuclear power capacity.

China will also accelerate the preparations for more reactors, such as Sanmen Units 3 and 4, Ningde Units 5 and 6 in Fujian, which will in total generate 9.9 GW after being put into operation.

The rollout is necessary for China's nuclear sector to develop step by step to meet high safety requirements, said Han Xiaoping, chief information officer at Beijing-based industry consultancy China Energy Net Consulting Co.

"Building nuclear power stations requires at least 10 years of preparatory work, including the eight units, which are about to kick off construction soon," Han said.

Han said China is at the forefront of nuclear power technology worldwide, with rich experience in building and operating nuclear power stations.

After Japan's Fukushima nuclear accident in March 2011, China had set higher standards in the nuclear sector to ensure safety, he said.

The country is moving to strengthen technical cooperation with Russia and the United States in the nuclear power sector and further promote cooperation with Pakistan, Turkey, Romania and Argentina.

Han said it is necessary for China's nuclear power utilities to tap overseas markets, to release capacity in the context of overcapacity in the domestic power sector.

He added as supply was far greater than demand in China's power sector, the country should focus on the development of low-carbon energy, especially the nuclear energy, to enhance the effective energy supply.

Xu He contributed to this story.

Most Viewed in 24 Hours
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 万山特区| 玉田县| 自贡市| 阿克苏市| 台中市| 马边| 浠水县| 邢台市| 湘乡市| 乌拉特后旗| 新晃| 苏尼特右旗| 碌曲县| 安新县| 娄烦县| 浦县| 邵东县| 招远市| 徐闻县| 常宁市| 衢州市| 吕梁市| 边坝县| 全椒县| 杭锦后旗| 临颍县| 乾安县| 景宁| 镇赉县| 南陵县| 贡觉县| 民乐县| 郑州市| 河池市| 澄迈县| 望谟县| 元氏县| 靖江市| 南江县| 澜沧| 石柱| 八宿县| 香格里拉县| 黄龙县| 庆云县| 承德市| 兴安县| 黄浦区| 乌海市| 眉山市| 称多县| 东至县| 铜梁县| 南开区| 舒城县| 中牟县| 化隆| 咸阳市| 盘锦市| 东辽县| 上杭县| 和林格尔县| 沁阳市| 福清市| 象山县| 阿鲁科尔沁旗| 珠海市| 山阴县| 水富县| 和平县| 兴和县| 通城县| 台中县| 宿州市| 布尔津县| 湘乡市| 永州市| 阿城市| 明水县| 友谊县| 安平县| 阿拉善右旗|