男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
   

CHINA / Regional

Sinking, cracks detected on Qinghai-Tibet railway
(chinadaily.com.cn/AFP)
Updated: 2006-07-28 17:34

The Qinghai-Tibet railway, opened this month to great fanfare, is developing surface cracks in its concrete structures while its permafrost foundation is sinking and cracking at some sections.

"The frozen ground that forms the foundation of the railway is sinking and cracking in some sections, making the railway unstable in some places," the Beijing News quoted railway ministry spokesman Wang Yongping as saying.

The first train from Lhasa Railway Station in Lhasa, Tibet, travels along a bridge heading for Lanzhou in Gansu province July 1, 2006.
The first train from Lhasa Railway Station in Lhasa, Tibet, travels along a bridge heading for Lanzhou in Gansu province July 1, 2006. [Reuters]

"The concrete is cracking on some of the railway structures and bridges, forming a hidden danger to the railway line quality."

Wang said experts are working on these problems and relevant authorities have taken measures to ensure the safety of the rail and passengers, without specifying these measures.

The railway to Lhasa, capital of Tibet Autonomous Region, was opened on July 1. It is dubbed a magnificent engineering feat and a miracle for the world.

The US$4.2-billion railway which runs 1,142-kilometers (713 miles) from the desert outpost of Golmud in Qinghai province to Lhasa is the highest in the world.

It climbs a peak of 5,072 meters (16,737 feet) above sea level along the Tibetan plateau, with the railway using supposedly state-of-the-art cooling techniques to ensure the permafrost foundation remains frozen.

Wang added that shifting sands in the region were also causing greater harm to the railway than expected, while engineers had still not figured out how to keep herds of yaks off the tracks, the report said.

"These form dangers to passengers on the train," he said.

Climatologists monitoring global warming last year said that rising temperatures could lead to the melting of the permafrost foundation of the railway, but said nothing about the frozen ground sinking or cracking.

Railway spokesman Wang did not say how engineers would address the problems.

The rail line is seen as an important tool in modernizing and developing Tibet.

Previously Tibet could only be reached on slow, uncomfortable bus rides or on relatively expensive flights. On the new train, people can travel for 48 hours from Beijing to Lhasa for under US$50.

 
 

Related Stories
 
主站蜘蛛池模板: 调兵山市| 山东省| 丹阳市| 柳江县| 卓资县| 浮梁县| 平山县| 饶河县| 临夏市| 喀什市| 弥渡县| 慈利县| 金平| 启东市| 永仁县| 迁安市| 句容市| 铁岭县| 临颍县| 洪湖市| 云林县| 叶城县| 维西| 文安县| 高要市| 平顶山市| 丘北县| 蓬安县| 南江县| 雅江县| 杭锦旗| 仁寿县| 固安县| 沂南县| 师宗县| 长沙县| 慈利县| 南川市| 丰镇市| 余姚市| 新昌县| 鹿泉市| 商都县| 柳江县| 渑池县| 大新县| 启东市| 自贡市| 淮滨县| SHOW| 德化县| 仲巴县| 荣成市| 垫江县| 肥城市| 九龙县| 弥渡县| 游戏| 临夏市| 巴青县| 北宁市| 吴堡县| 漠河县| 卫辉市| 台江县| 苏尼特左旗| 澎湖县| 合川市| 铁岭市| 淅川县| 安阳市| 始兴县| 日土县| 古丈县| 大田县| 河源市| 探索| 武邑县| 长宁区| 宁海县| 鸡西市| 昌江|