|
CHINA> National
![]() |
|
Beijing-Tianjin railway starts ticket sales for Friday debut
(Xinhua)
Updated: 2008-08-01 00:02 The railway, on which construction started in July 2005, was built at a total cost of 21.5 billion yuan (US$3.1 billion), said Wang.
About 100 km of the line, or 86 percent, was built on an elevated alignment because of the area's alluvial soil, which was sensitive to ground settlement. The new service would cut the 120-km journey from the current 70 minutes to about 30 minutes, according to Wang. There are five stations along the line: the cavernous new Beijing South Railway Station, Yizhuang, Yongle, Wuqing and Tianjin. The train is classifed by the MOR as C-category, with C standing for Chengji, meaning intercity. There will be 10 trains of eight cars that can seat about 600 passengers. These sleek trains, with aircraft-like cabins, swivel seats, spacious interiors and rooftop solar panels, were built by the Sifang Locomotive and Rolling Stock Company. Called the CRH-3 (China Railway High-speed), these were China's first self-designed and self-manufactured passenger trains. The MOR had said about 26 million passengers traveled between the two cities every year, and this new line was forecast to raise the figure to 32 million in 2008. |
|||||
主站蜘蛛池模板: 慈利县| 青神县| 铁岭市| 大连市| 巢湖市| 安徽省| 望谟县| 新丰县| 文安县| 日照市| 普兰县| 吉木乃县| 哈尔滨市| 盈江县| 治多县| 苏尼特左旗| 广汉市| 南岸区| 仁布县| 定日县| 广元市| 武穴市| 荃湾区| 民丰县| 兰考县| 陇西县| 十堰市| 长顺县| 泗洪县| 全州县| 南木林县| 阳江市| 泾阳县| 阳高县| 寿阳县| 富平县| 衡水市| 西吉县| 西吉县| 贞丰县| 泗水县| 中西区| 神木县| 内黄县| 南丹县| 安丘市| 尼勒克县| 鹤庆县| 永春县| 湘潭县| 类乌齐县| 包头市| 游戏| 双辽市| 临安市| 安达市| 依兰县| 南通市| 永清县| 麻城市| 博野县| 会泽县| 香格里拉县| 城口县| 高青县| 疏勒县| 尚义县| 镇赉县| 界首市| 铁岭市| 昌图县| 湘乡市| 临沭县| 阿城市| 新化县| 湘阴县| 防城港市| 老河口市| 航空| 射洪县| 凤山市| 汶上县|