|
CHINA> National
![]() |
|
Stimulus fund flowing toward sewage upgrades
By Li Jing (China)
Updated: 2009-06-26 07:52 Green projects are among the major beneficiaries of the government's 4-trillion-yuan stimulus package. Wan Bentai, chief engineer at the Ministry of Environmental Protection (MEP), said some 210 billion yuan ($30.7 billion) will support environmental initiatives, including the construction of sewage and waste treatment facilities and improvements to energy-efficiency and ecology conservation. A total of 160 billion yuan will flow into pollution treatment projects aimed at protecting rivers and lakes. Work will benefit Huaihe, Haihe and Liaohe rivers, Taihu, Chaohu, and Dianchi lakes, as well as reservoir areas for the Three Gorges and Xiaolangdi hydro project on the Yellow River.
Projects to reduce energy use and prevent industrial pollution will get 40 billion yuan, while the last 10 billion from the 210-billion will go to ecological conservation. "China's economic recovery will not come at the expense of environmental degradation," Wan said. The beefed-up investment in green projects followed officials vowing to develop green industries as a new engine for economic growth. By the end of April, about 23 billion yuan from the stimulus package had been directed at energy conservation, emission control and environmental protection, according to the National Development and Reform Commission (NDRC). The latest report from the Ministry of Finance shows that between January and May, spending on environmental protection rose 93.5 percent over the period last year. Jinsha River work stalled Wan confirmed the construction of two dams on the middle reaches of Jinsha River had been halted.
Work on the Lulida and Longkaikou hydro-electric projects, which are owned by Huadian Power and Huaneng Power respectively and located in Lijiang, Yunnan province, began in January without the mandatory environment impact assessment. "MEP has sent an inspection team to the construction site," Wan said. "It found the two companies had already halted construction and workers had been withdrawn. People in charge of these projects from the two power companies have come to MEP to acknowledge their mistakes." The fate of the projects will be determined via an overall assessment being carried out by NDRC, MEP and the Ministry of Water Resources, Wan said. "Construction of the two hydro projects will only be resumed if they fit into the overall development plan for Jinsha River," Wan said. |
主站蜘蛛池模板: 新沂市| 桐庐县| 青川县| 胶州市| 普兰店市| 兴安盟| 资源县| SHOW| 洱源县| 禄劝| 安塞县| 祁连县| 左权县| 泽库县| 通海县| 从江县| 临汾市| 那曲县| 梅州市| 淮安市| 措勤县| 五河县| 澄江县| 阜阳市| 定结县| 兖州市| 神池县| 上杭县| 庆阳市| 渭南市| 金沙县| 郯城县| 和田市| 比如县| 沙湾县| 上蔡县| 东丽区| 辽阳市| 雅安市| 根河市| 克什克腾旗| 神池县| 盘山县| 建昌县| 沁水县| 赣榆县| 延川县| 万宁市| 交口县| 永州市| 定日县| 淮阳县| 咸宁市| 西安市| 永城市| 大英县| 简阳市| 淄博市| 明水县| 城固县| 改则县| 彭水| 铜梁县| 湖南省| 南京市| 湘西| 松江区| 武山县| 彩票| 乐清市| 天津市| 黄大仙区| 濉溪县| 永泰县| 绍兴市| 红桥区| 赞皇县| 南京市| 桃江县| 民县| 盐源县| 十堰市|