男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
US EUROPE AFRICA ASIA 中文
China / Society

Project set to deliver clean water next year

By Jin Zhu (China Daily) Updated: 2012-07-26 07:28

The eastern route of the South-to-North Water Diversion Project has made obvious progress on pollution control, and will achieve its ambitious goal of supplying clean water next year, authorities said.

From January to April, the water quality of all sections along the eastern route's trunk canals increased to Grade III, the minimum standard for drinking water after necessary treatment, according to the State Council's Office of the South-to-North Water Diversion Project Commission.

Also, nearly 90 percent of monitored cross sections along the eastern route met mandatory water quality standards during the same period.

"For the eastern route, pollution control is the key to success as years of industrial pollution in the surrounding areas led to the extreme decline of local water quality," Shi Chunxian, an official on environmental protection of the SNWD project office, told China Daily.

The SNWD project, the world's largest water diversion project, is designed to take water from the massive Yangtze River in the south to meet demand in drought-prone cities in the north, via three water-diversion routes.

Project set to deliver clean water next year

By 2013, the project's eastern route will transfer water from Jiangdu, Jiangsu province on the Yangtze River into Shandong province along the Beijing-Hangzhou Grand Canal.

The SNWD project office has long been concerned about the contamination of water quality in the two provinces from the industrial boom, domestic sewage from rural areas and shipping on small wharves.

All of the 426 pollution prevention projects, with a total cost of 15.3 billion yuan ($2.4 billion), have been implemented to improve water quality on the eastern route, according to the SNWD project office.

"The pollution control tasks on the eastern route are the most formidable that I have ever seen," said Zhang Bo, head of the Shandong Environmental Protection Department.

The number of paper companies in Shandong was reduced by 70 percent from 2002 to 2010, while chemical oxygen demand, a major indicator used to measure water pollution, decreased by 62 percent, according to the department.

"But the closure of such a large number of companies has not caused an economic loss in the local paper industry. The current companies are highly competitive and have mostly adopted environmentally friendly technologies to curb pollution," Zhang said.

For example, paper output in Shandong in 2010 was 2.5 times larger than in 2002, he said.

Zhang said a comprehensive pollution control scheme that combines pollution management, wastewater recycling and biological environmental protection has been launched.

Project set to deliver clean water next year

A worker in charge of monitoring water quality drinks a sample from Weishan Lake in Shandong province, on July 18. The quality of the lake water is up to Grade III, a standard fit for drinking. Deng Jia / for China Daily

The recycled wastewater is now utilized for city afforestation, cleaning and agricultural irrigation, he said.

A 50- to 100-meter-wide green belt has been built around the Nansihu Reservoir in Shandong to prevent pollution.

The reservoir was once known for its severe pollution. But as of April, its water quality was close to Grade III - a dramatic improvement from "worse-than-Grade-V" in 2006, local official figures showed.

More than 200 species of birds dwell on the reservoir, while some fish that had disappeared for many years have returned.

A local resident surnamed He, who lives near a small wharf in Xuzhou, Jiangsu province, told China Daily that his quality of life has improved since the wharves closed.

"I used to close my windows to keep out the noise and coal cinder. But now those troubles are gone. A leisure square will be built soon at the original place of the wharves," he said.

"Many efforts will be made to curb pollution in rural areas in the future, such as building more small-scale sewage treatment plants to prevent any pollution incidents from occurring when the eastern route starts to supply water next year," said Guo Peng, an official in charge of environmental protection on the eastern route from the SNWD project office.

Vast amounts of water will be supplied to the country's arid northern regions within the next two years, when the first phase of the project's eastern and central routes is completed.

So far, 161.7 billion yuan, or 73 percent of its total investment, has been used, official figures showed.

jinzhu@chinadaily.com.cn

Highlights
Hot Topics
...
主站蜘蛛池模板: 达尔| 酒泉市| 大余县| 南汇区| 祁阳县| 成武县| 达拉特旗| 陆丰市| 井陉县| 渝北区| 石楼县| 庆元县| 滨州市| 于田县| 安西县| 综艺| 克什克腾旗| 武穴市| 巴南区| 龙南县| 溧水县| 乌鲁木齐县| 河北区| 西林县| 镶黄旗| 伊吾县| 钦州市| 临漳县| 北票市| 民乐县| 武乡县| 沂水县| 商南县| 甘肃省| 海原县| 嘉黎县| 凤凰县| 凤庆县| 来宾市| 南靖县| 汾西县| 崇礼县| 南溪县| 喀喇沁旗| 新丰县| 徐州市| 河源市| 湾仔区| 龙游县| 眉山市| 雅江县| 永福县| 二手房| 壶关县| 乃东县| 曲水县| 安多县| 江源县| 和平区| 大名县| 余庆县| 溧阳市| 沾益县| 民县| 凤山县| 子长县| 阿荣旗| 绩溪县| 左贡县| 嘉义市| 土默特左旗| 广汉市| 淮南市| 葫芦岛市| 杨浦区| 扬中市| 柳河县| 夏河县| 特克斯县| 汨罗市| 东海县| 双桥区|