男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
US EUROPE AFRICA ASIA 中文
China / Society

Capital's subway system branches out

By Zheng Xin (China Daily) Updated: 2013-01-04 09:08

Unprecedented construction of Beijing's gigantic underground transit network is expected to alleviate traffic problems that have been haunting the metropolis for decades, reports Zheng Xin.

Capital's subway system branches out

A woman takes photos at Nanluoguxiang Station on Line 6 on Sunday. The station's decoration features the traditional folk art of Beijing. Wei Xiaohao / for China Daily

The Beijing Subway has seen unprecedented construction in recent years, greatly easing traffic congestion in the Chinese capital.

Including a new line and extensions to lines, the city boasts a network of 15 lines, covering 11 districts, with 221 stations and 442 km of track.

Wang Renqiang, a leading project official of the subway's Line 6 project department of the China Railway Tunnel Group, said once everything is operational, the updated network will make it easier for people to get around and provide relief to transport services on the ground.

The Beijing Subway is the busiest on the Chinese mainland in terms of passenger volume, and the largest in terms of operational length.

It is estimated the total operational length of the Beijing system will reach 1,050 km by the end of 2020, with 30 lines and some 450 stations, according to the Beijing government.

The four new services, which started operating on Dec 30, are Line 6, which connects the east and west of the capital; an extension to Line 10, which will form the capital's second loop line once finished; an extension to Line 8, which connects the city center and northern suburbs; and an extension to Line 9 to serve Beijing West Railway Station.

Capital's subway system branches out

Line 6 will eventually be 52 km long and boast 32 stations, according to the Beijing Municipal Commission of Transport. This involves three phases, with the entire route becoming operational by the end of 2015.

The first phase is 30.4 km long, with 20 underground stations, while the second will cover another 12.4 km, with seven stations.

According to the commission, the government has so far invested about 18.4 billion yuan ($3 billion) in Line 6, with some 16.6 billion yuan going into the first phase.

Capital's subway system branches out

The first phase runs from Wuluju in Haidian district in the west of the capital to Caofang in Chaoyang district in the east. Trains can accommodate 1,960 passengers on a single trip, more than can be carried on a single trip on any of the capital's other subway lines.

It is also the fastest line on the system, with trains running at a maximum speed of 100 kph, compared to the current highest speed of 80 kph. Trains will take 48 minutes to travel the whole line.

One of the reasons for the speed is that stations are far apart, with the longest distance between two consecutive stations being four km.

In addition to its capacity and speed, Line 6 also features the deepest station on the system, with the connection to Dongsi Station on Line 5 being 34 meters underground.

The city's subway system is under considerable pressure, with serious overcrowding during rush hours, partly because of the ticket price of just 2 yuan (31 cents) regardless of the length of journey.

Contact the writer at zhengxin@chinadaily.com.cn

Highlights
Hot Topics

...
主站蜘蛛池模板: 达日县| 理塘县| 武陟县| 大关县| 清流县| 津南区| 吉林市| 揭东县| 琼结县| 渭南市| 巩义市| 广饶县| 通州市| 伊春市| 渭南市| 泌阳县| 文安县| 哈尔滨市| 陇南市| 南宫市| 夏津县| 嘉峪关市| 衡水市| 延吉市| 鄢陵县| 永安市| 唐海县| 绥化市| 千阳县| 屯昌县| 怀远县| 中卫市| 湖北省| 禹州市| 翁牛特旗| 梧州市| 会同县| 阜城县| 台中县| 噶尔县| 贺州市| 清涧县| 富蕴县| 峨眉山市| 陆丰市| 扶绥县| 宁武县| 吉水县| 嘉义市| 陇西县| 盈江县| 公主岭市| 高阳县| 大化| 呼伦贝尔市| 监利县| 凤冈县| 墨脱县| 云和县| 蓬莱市| 弋阳县| 福州市| 进贤县| 公主岭市| 普安县| 宁城县| 武冈市| 民丰县| 新河县| 洞口县| 三台县| 黔东| 汉阴县| 肥乡县| 涪陵区| 德兴市| 平乡县| 手机| 大城县| 信宜市| 忻州市| 沾化县|