男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
  .contact us |.about us
Home BizChina Newsphoto Cartoon LanguageTips Metrolife DragonKids SMS Edu
news... ...
             Focus on... ...
   

Work starts on controversial theatre
( 2001-12-15 00:19 ) (1 )

The construction of China's controversial National Grand Theatre officially started recently after four years of preparation and is expected to take four years.

Some revisions have been made to the original plan to reduce costs and construction area.

The current estimated cost of the project is 2.688 billion yuan (US$325 million), substantially less than the original 3 billion yuan (US$362 million).

The reduction in cost comes mainly from the cancellation of the complex's theatre, which will leave it with an opera hall, a concert hall, an auditorium and art galleries.

Total construction area has been cut from the original 180,000 square metres to 149,500 square metres, because the 30,000 square metre parking lot, originally included in the plan, is going to be built separately.

This new parking lot will provide the entire Tian'anmen Square area with its first major parking lot.

When the parking lot is finished, it will be able to accommodate 1,000 vehicles and 1,400 bicycles. Parking will no longer be a headache when there are major activities in the square.

The theatre, located on the west side of the Great Hall of the People in downtown Beijing, will be built to a modernistic design by French architect Paul Andreu.

Wang Zhengming, spokesman ofthe group developing the theatre, told China Daily Friday that the theatre, although it would not to be the world's most luxurious, would present "some pleasant surprises'': some of the world's best performance facilities.

Departments involved with the building of the theatre have also solicited opinions from experts and the general public on the design before finalizing the plan.

Wang denied reports that the start had been deliberately played down in order to dodge attacks from people opposing the development.

"Most key construction projects, such as the Fifth Ring Road, have not been started with great fanfares, so our quiet start is not out of the ordinary,'' he said.

"Let us celebrate at the completion of the project instead.''

Although the Grand Theatre is planned to be completed in 2005, Wang said they were working hard to finish earlier.

"It would not be a bad thing to provide our citizens with the best theatre facilities our country can offer ahead of schedule,'' said he.

(China Daily by Tang Min)

 
   
 
   

 

         
         
       
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
主站蜘蛛池模板: 桃江县| 含山县| 天全县| 乌审旗| 六枝特区| 南靖县| 丰台区| 金华市| 衡阳县| 安泽县| 图们市| 石首市| 砚山县| 祥云县| 环江| 连平县| 株洲市| 乌拉特中旗| 会东县| 永福县| 新和县| 浮梁县| 潞西市| 延边| 七台河市| 达孜县| 留坝县| 正镶白旗| 舟山市| 弥勒县| 大足县| 塔城市| 邛崃市| 普安县| 团风县| 平定县| 新干县| 昭苏县| 松滋市| 会东县| 页游| 韶关市| 金塔县| 昆山市| 宣恩县| 唐河县| 石阡县| 龙门县| 临高县| 陆河县| 金乡县| 浦北县| 石楼县| 巩留县| 乐平市| 密山市| 商洛市| 通河县| 泸水县| 新宾| 井冈山市| 黎川县| 澄城县| 时尚| 沅江市| 吉安县| 平阳县| 罗山县| 富阳市| 汕尾市| 鹤峰县| 安平县| 冷水江市| 武平县| 抚顺市| 佛冈县| 桑日县| 绥德县| 唐海县| 杂多县| 道真| 新营市|