男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
  Home>News Center>China
       
 

Thirst for power could be quenched in 2006
By Zhang Lu (China Daily)
Updated: 2004-09-22 01:00

China's power supply will likely meet demands by 2006, said Zhao Xizheng, president of the State Grid Corporation of China, the country's largest power transmission and distribution firm.

"With the implementation of macro-control measures taken by the Chinese Government and the further increasing of power supply capacity, the situation of power shortages will probably be alleviated next year.

"The basic balance between supply and demand of power is expected to be reached in 2006," Zhao said at the World Industrial and Commercial Organizations Summit held on Monday in Beijing.

It is estimated that the country will have new power generators with an installed capacity of 42.8 million kilowatts in operation this year.

The newly-added installed capacity will be 60 million kilowatts in 2005 and 150 million kilowatts in 2006.

However, "the situation between power supply and demand will remain tense this winter and spring, due to fast economic growth, current power construction and other factors like weather," said Ma Zhizhong, spokesman for the State Grid Corporation of China at the company's press conference yesterday.

According to Ma, as weather is now becoming cooler around the country, loading capacity of the company's major grids began to fall and power supply problems were slightly eased.

Statistics show large-scale power shortages occurred in the country in the middle of the 1960s. In 1997, the balance of power supply and demand was realized for the first time.

However, the situation has become tense since 2000. This year, the problem grows more serious.

Twenty-four provincial grids have cut the switch and restricted power supply this year, as power demands increase drastically.

During the summer, power shortages in the State Grid's operated areas reached 29.83 million kilowatts.

The shortage for grids in North China, East China and Central China was 7.47 million kilowatts, 20.78 million kilowatts and 1.58 million kilowatts respectively, said Ma.

By the end of August, the company's 20 grids had cut the switch a total of 999,000 times, causing an electricity loss of 31.85 billion kilowatt-hours.

Despite the serious situation, the company has taken measures, like cross-region transmission and demand-side management, to basically ensure the stable and safe operation of the nation's grids and guarantee regular power supply around the country.

"Facing rapid increases in power demand and power generation, the company will further expand its grid construction, as well as complete the connection between provincial grids, to alleviate China's power shortage," Ma said.



 
  Today's Top News     Top China News
 

4 countries jointly bid for Security Council seats

 

   
 

Wen: China supports Russia to fight terrors

 

   
 

Yukos called to honour oil commitments

 

   
 

Website: 2nd US hostage killed in Iraq

 

   
 

Border issue solved with Kyrgyzstan

 

   
 

US Fed raises rates for third time

 

   
  China opposes proliferation of nuke
   
  Border issue solved with Kyrgyzstan
   
  Rally marks 55th birthday of CPPCC
   
  Livestock exports to Mideast resume
   
  Yukos called to honour oil commitments
   
  Thirst for power could be quenched in 2006
   
 
  Go to Another Section  
 
 
  Story Tools  
   
  News Talk  
  It is time to prepare for Beijing - 2008  
Advertisement
         
主站蜘蛛池模板: 年辖:市辖区| 兰州市| 汉中市| 吴川市| 南川市| 巴楚县| 广州市| 义乌市| 昌黎县| 昔阳县| 桃江县| 藁城市| 阳信县| 滨海县| 南昌县| 广汉市| 孝昌县| 印江| 大姚县| 台南县| 铜梁县| 祁东县| 沈丘县| 赤水市| 平利县| 原阳县| 武乡县| 林周县| 且末县| 固阳县| 龙江县| 利川市| 班戈县| 渭源县| 元谋县| 麻阳| 梧州市| 巩义市| 冕宁县| 万安县| 东乡族自治县| 鱼台县| 洞口县| 改则县| 淮阳县| 永丰县| 余干县| 岳阳市| 西平县| 奉节县| 连江县| 公安县| 石门县| 永嘉县| 专栏| 普兰县| 奉新县| 清远市| 平陆县| 石门县| 呈贡县| 江安县| 大足县| 拜城县| 福海县| 吴旗县| 合作市| 荆州市| 东兴市| 新丰县| 松江区| 乌什县| 全州县| 海门市| 罗田县| 息烽县| 景泰县| 莲花县| 华容县| 通海县| 盈江县| 当阳市|