男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
  Home>News Center>World
         
 

Bad brakes force Amtrak to cancel Acela
(Agencies)
Updated: 2005-04-16 11:10

The Acela Express, Amtrak's much-ballyhooed hope for high-speed train travel, was shut down indefinitely Friday because of brake problems, leaving thousands of travelers scrambling for other transportation.

The beleaguered rail service pressed slower trains into use along the Northeast corridor between Washington, New York and Boston.

All Acela service will be suspended at least through next Wednesday and most is likely to be shut down for much longer because of newly discovered cracks in disc brakes, said Amtrak chief operating officer Bill Crosbie.

"We're very early into this," said Crosbie, estimating it was likely to take more than two months to do all the repairs, depending on the availability of replacement parts.

Millimeter-sized cracks were found in 300 of the Acela fleet's 1,440 disc brake rotors.

Amtrak said the extra trains would not be able to compensate for all the lost Acela seats. People with reservations who cannot get a ticket on another train — or don't want one — are entitled to a refund, the company said.

Amtrak normally runs 15 Acela weekday roundtrips between New York and Washington and 11 between New York and Boston. Acela accounts for about 20 percent of Amtrak's Boston-New York-Washington weekday service, some 9,000 passengers. On Friday's that's usually about 10,000.

The cracked brakes come at a bad time for Amtrak. A Senate committee will debate next week whether to end the rail service's federal subsidy — as the Bush administration has recommended — and radically reshape train travel in the United States.

"We're always under political pressure," said Amtrak CEO David Gunn. "I don't think that this will be a factor per se."

When Acela service was launched Dec. 11, 2000, the trains were billed as the faster, brighter future of Amtrak. Running only in the Northeast corridor, the trains can reach speeds of 150 mph and feature amenities such as conference tables in passenger cars, pub-style cafe cars with expanded menus and three audio music channels with headphone outlets at each seat.

The manufacturer, Bombardier Inc., had no immediate explanation for the cracks found on the steel spokes of disc brakes on most coaches.

"We want to get them up and running as soon as possible, but until we really understand the issue fully that's going to be an open question," said Bombardier spokesman David Slack.

The cracks were discovered during routine inspections, and no brake failures or other safety problems had occurred, Amtrak said.

That was little comfort to stranded business travelers and those who had made weekend plans.

Standing in line at New York's Penn Station, accountant Linda Priebe feared she wouldn't make it home to Baltimore Friday.

"If they can't give me a ticket to go in a couple of hours, I'm going back to the hotel," she said.

Art curator Stanley Babcock wasn't ready to give up.

He said he was ready to ride sitting on the floor. "Otherwise all my hotel and restaurant plans will be ruined."

Most other Amtrak service was scheduled to operate normally, but the company added four more regional trains Friday to try to handle the displaced passengers.

"It's going to be a challenge for us because we have limited additional equipment," said spokesman Cliff Black.

Lawmakers already upset over the Bush administration's plans to end most funding for Amtrak argued the incident shows Amtrak needs more help, not less.

"When Amtrak is terribly underfunded and has to operate on a shoestring budget, these kinds of things will keep happening, which will really disrupt people's lives and our economy," said Sen. Charles Schumer (news, bio, voting record), D-N.Y.

The White House seeks to radically reshape what Transportation Secretary Norman Y. Mineta had called "a dying railroad company."

A day before the Acela cancellation, the administration sent Congress a plan to reshape Amtrak as a private operator focused on running trains, not maintaining tracks or stations.

President Bush proposed in his 2006 budget eliminating Amtrak's operating subsidy. If the railroad ceased operating, the administration has offered to set aside $360 million to run trains along the Northeast Corridor. The current budget gives Amtrak some $1.2 billion in operating subsidies and capital investment.

Acela Express service also was halted in August 2002 after inspectors discovered cracks on a bracket holding a shock-absorbing assembly to one Acela Express locomotive. Additional cracks were later found around the assemblies of other locomotives.



 
  Today's Top News     Top World News
 

Foreign Ministry opens house to public

 

   
 

Law 'eases tensions' across Straits

 

   
 

Rich or poor, cancer is nation's biggest killer

 

   
 

Diplomat: Shrine visit hinders ties

 

   
 

Nation's riot police join peace mission in Haiti

 

   
 

UK police hunt for 3 missing Chinese girls

 

   
  Paris hotel fire kills 20, half of them children
   
  Reports: US airport screeners still do poorly
   
  Paris hotel fire kills at least 17
   
  Ex-Guantanamo prisoner didn't know of 9/11
   
  Abbas tries to reform security services
   
  France's Chirac tries to save EU Constitution
   
 
  Go to Another Section  
 
 
  Story Tools  
   
  News Talk  
  Are the Republicans exploiting the memory of 9/11?  
Advertisement
         
主站蜘蛛池模板: 锦屏县| 曲松县| 聂荣县| 隆安县| 房山区| 章丘市| 烟台市| 瑞金市| 永年县| 武邑县| 县级市| 晋州市| 封开县| 巴楚县| 汤阴县| 沂南县| 永川市| 监利县| 蕉岭县| 台南县| 健康| 兴隆县| 万荣县| 罗甸县| 丁青县| 洪江市| 图木舒克市| 旌德县| 邢台市| 自贡市| 行唐县| 洪湖市| 安平县| 莱州市| 芷江| 阿克苏市| 安国市| 若羌县| 台北县| 个旧市| 西乌珠穆沁旗| 石首市| 云安县| 绥棱县| 阿拉善盟| 云南省| 九江县| 河间市| 滁州市| 六安市| 红原县| 昌图县| 寻乌县| 双牌县| 南溪县| 芒康县| 林周县| 长治县| 布拖县| 远安县| 玛沁县| 滕州市| 虞城县| 灌阳县| 改则县| 比如县| 石柱| 五寨县| 沧州市| 尚义县| 嘉义市| 鹰潭市| 上饶县| 灵宝市| 永清县| 桃园县| 卢氏县| 辽中县| 贡觉县| 图们市| 西华县| 青龙|