男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
  Home>News Center>China
       
 

China to build thermonuclear fusion reactor
By Yu Zheng (Xinhua)
Updated: 2005-07-01 08:38

A leading Chinese plasma physicist said Thursday China might build its own thermonuclear experimental reactor, which would be expected to supply sustained electricity for the world's most populous country.

While building their own sophisticated devices in thermonuclear reaction, Chinese scientists have already participated in the International Thermonuclear Experimental Reactor (ITER), a testing step between today's plasma physics studies and tomorrow's electricity-producing fusion power plants.

The scientist, who has access to the ITER, said to Xinhua on condition of anominity, "The ultimate goal of the Chinese scientists is to build thermonuclear experimental reactors with their own efforts."

"International cooperative endeavors like the ITER make us keepabreast of the world's most advanced technologies," He said. "We're entitled to share all top-notch know-how once we enter the global consortium."

Using deuterium, which is in seawater, as fuel for reactions, a hydrogen plasma torus operating at over 100 million Celsius degrees will produce 500 megawatts of fusion power. The ITER, which means "the way" in Latin, is based on the idea.

All the commercialized nuclear reactors in the world were designed for fission, a process contrary to the ITER's fusion, and have to consume irrecycled mineral resources such as uranium and plutonium. Waste of fission reactors is radioactive while a fusionreaction is rather environment-friendly.

Chinese scientists started to develop a fusion operation torus four decades ago in mountains southwest of inland Sichuan Province.

In the late 1980s, the United States and Japan launched the ITER, which was joined by China in 2003. Among the six partners ofthe 10 billion-euro ambitious plan, the European Union will cover 50 percent of the total budget. The remaining five, the US, Japan,Russia, the Republic of Korea and China, will pay 10 percent each.

Since 2003, the Chinese team has mandated a batch of important missions. The ITER international coordinator, Japanese physicist Yasuo Shimomura said, "The work done by the Chinese is the most impressive."

The Chinese Academy of Sciences (CAS) Institute of Plasma Physics is developing an Experimental Advanced Superconducting Tokamak (EAST), one prototype of the ITER.

The EAST, which costs 200 million yuan (24 million US dollars) and is scheduled for completion late this year, could operate at over 100 million Celcius degrees and produce electricity in a consecutive 1,000 seconds, which will be a world record.

"The EAST is the only prototype nearest to the ITER and will be unbeatable in at least one decade," an official with the CAS Bureau of Basic Research said.

After fierce diplomatic manoeuvers, the six partners agreed Tuesday in Moscow to construct the first ITER at Cadarache, near Aix-en-Provence, France, overriding Japan's competition for hosting the innovative reactor.

It is ready to start ITER construction and the first plasma operation might be in 2016. But the most optimistic estimation on first commercialization of ITER said it needs at least half a century.

After the deal was clinched in Moscow, Chinese Minister of Science and Technology Xu Guanhua said, "As China is short of energy, global research endeavors for energy supply solutions meetour strategic interest."



Special police detachment established in Xi'an
Panda cubs doing well in Wolong
Suspect arrested in Taiwan
  Today's Top News     Top China News
 

Taiwan's KMT Party to elect new leader Saturday

 

   
 

'No trouble brewing,' beer industry insists

 

   
 

Critics see security threat in Unocal bid

 

   
 

DPRK: Nuke-free peninsula our goal

 

   
 

Workplace death toll set to soar in China

 

   
 

No foreign controlling stakes in steel firms

 

   
  No foreign controlling stakes in steel firms
   
  China-made telescopes race to space
   
  'No trouble brewing,' beer industry insists
   
  HK investors cautious on mainland homes
   
  Law in pipeline to ban money laundering
   
  Overseas students test their Chinese abilities
   
 
  Go to Another Section  
 
 
  Story Tools  
   
  News Talk  
  It is time to prepare for Beijing - 2008  
Advertisement
         
主站蜘蛛池模板: 南川市| 临颍县| 杭锦后旗| 明水县| 托克逊县| 承德县| 宣威市| 芦溪县| 东港市| 万安县| 潮安县| 陇川县| 丰台区| 娱乐| 临江市| 西畴县| 武鸣县| 齐齐哈尔市| 沙坪坝区| 湘乡市| 新疆| 四子王旗| 泾川县| 开原市| 平阴县| 荔浦县| 宁明县| 海阳市| 洛隆县| 陆河县| 长沙县| 延寿县| 政和县| 凉山| 盐津县| 枣强县| 德保县| 逊克县| 镇原县| 三江| 五家渠市| 乌兰浩特市| 呼图壁县| 松阳县| 仪征市| 永济市| 靖州| 安阳县| 阳朔县| 宁城县| 屏山县| 时尚| 修文县| 右玉县| 吉林省| 汾阳市| 西华县| 石景山区| 泰兴市| 安陆市| 汝城县| 卢氏县| 阜南县| 深泽县| 康乐县| 化州市| 交城县| 保康县| 海阳市| 马龙县| 新巴尔虎左旗| 鄱阳县| 民县| 长阳| 安平县| 靖远县| 芷江| 奉节县| 清远市| 龙山县| 镇赉县| 开江县|