男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影

CAD offers new landing path to reduce fuel costs

Updated: 2008-06-19 07:25

By Peggy Chan(HK Edition)

  Print Mail Large Medium  Small

To help the aviation industry save on fuel costs, the Civil Aviation Department (CAD) has made available a shortened flight path which will save minutes of flight time for flights landing at the Hong Kong International Airport (HKIA).

Director-General of Civil Aviation Norman Lo Shung-man said yesterday that as much as seven minutes of flight time can be saved.

 CAD offers new landing path to reduce fuel costs

A Cathay Pacific Boeing 777 taxing for take-off at the Hong Kong International Airport. File Photo

Lo reiterated that the standard distance between flights will remain the same under the new arrangement so as to ensure safety, and the original route will still be available for use should the new flight path is congested.

Meanwhile, the CAD has recently given the green light to some airlines to raise fuel surcharges.

Lo stressed that the approved increases are far less than what the airlines demanded.

He added it is likely that various airlines will apply for further increases when the CAD reviews the surcharges in August.

He said conducting a surcharge review on a monthly basis instead of once every two months which is the current practice will make it difficult for both the CAD and the industry to adapt to.

Meanwhile, Cathay Pacific Airways said the soaring oil price has drastically pushed up its operating costs.

"Fuel now constitutes over 40 percent of our operating costs," a spokesperson said.

The airline has yet to decide if it will appeal for higher fuel surcharges two months later.

In another development, Lo said the CAD will upgrade the city's navigation system in four years to cater for the increasing volume of air traffic.

Lo added whether there will be a third runway depends on the results of an assessment to be conducted by the Airport Authority.

The assessment, which will focus on the runway's impact on the environment, is scheduled to be completed by 2010.

Meantime, Lo revealed that over the past two months, the CAD has been conducting conferences and simulation tests to prepare for the Olympic equestrian events to be held in August.

The tests included the simulated landing of a flight with horses onboard, and the adoption of contingency measures under bad weather.

The tests will be completed by next month.

(HK Edition 06/19/2008 page1)

主站蜘蛛池模板: 五家渠市| 景洪市| 大埔区| 武山县| 安庆市| 富锦市| 鸡东县| 北碚区| 通榆县| 都昌县| 攀枝花市| 平遥县| 无锡市| 三明市| 清流县| 五常市| 陆良县| 武定县| 隆安县| 陈巴尔虎旗| 罗田县| 高邮市| 龙川县| 敦煌市| 黄龙县| 汽车| 临颍县| 沅陵县| 淅川县| 双流县| 双峰县| 余江县| 恩施市| 阜新市| 长宁县| 金寨县| 宁河县| 仁化县| 齐齐哈尔市| 墨江| 绍兴市| 洞头县| 夹江县| 华坪县| 静乐县| 英吉沙县| 米泉市| 手游| 阳春市| 永济市| 鄯善县| 绥宁县| 馆陶县| 德州市| 合作市| 江西省| 汉源县| 西藏| 曲阳县| 广丰县| 云浮市| 赣州市| 湖南省| 宜丰县| 喜德县| 乌鲁木齐市| 苏尼特左旗| 安西县| 昆明市| 马尔康县| 榆社县| 乐都县| 绥中县| 渭南市| 大洼县| 蚌埠市| 子洲县| 大同县| 普洱| 祥云县| 仪陇县| 三门县|