男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影

News >Bizchina

Jiuquan helps facilitate its 10-gW wind power base

2010-07-01 11:49

Jiuquan helps facilitate its 10-gW wind power base

Wind power turbine parts are seen at the production line of Gansu Glod Wind Power Equipment Manufacturing Co located at Gansu Jiuquan Industrial Park in Jiuquan, Gansu province on June 30, 2010. 

A reporting group of journalists from the country's nine newspapers, news agencies and magazines paid a visit to Gansu Jiuquan Industrial Park's Wind Electricity Equipment Manufacture Industrial Park on June 30, 2010, ahead of the 2010 China (Jiuquan) International New Energy Industry Fair, which is set to be held in the city of Jiuquan, Gansu province on July 7.

The media group visited enterprises manufacturing wind power equipment such as wind power turbines and blades, which are to be installed at Jiuquan's 10-gigawatts wind power base only 150 km away from the park.

Using the locally manufactured wind power equipment will greatly reduce the transportation costs, as the equipment used in Jiuquan came from Lianyungang city of Jiangsu province before the park was established in 2008.

"Transporting a single wind power blade from Lianyungang to Jiuquan will cost 100,000 yuan, but now the cost is only 20,000 yuan because it is produced here," said Yu Chengzhai, an official with the government of Suzhou district of Jiuquan.

The wind power equipment manufactured at the park will also be provided for the planned 10-gW level wind power bases in Hami in the Xinjiang Uygur autonomous region, western Inner Mongolia autonomous region and western Qinghai province, as all of them are within 600 kilometers from the park.

The establishment of a wind power equipment manufacturing park is in accordance with the country's target of reducing emissions and developing new energy, said Liu Yan, of the industrial park's regulation committee.

According to the National Development and Reform Commission's plan, Jiuquan's installed wind power capacity will reach 5.16 gW in 2010 and hit 12.71 gW by 2015.

Related News:

主站蜘蛛池模板: 徐州市| 瑞金市| 瑞安市| 江达县| 米易县| 澜沧| 普兰县| 正阳县| 鄂伦春自治旗| 聂荣县| 泗阳县| 盐津县| 佳木斯市| 科技| 巢湖市| 太湖县| 水城县| 武邑县| 太仓市| 大城县| 广南县| 牟定县| 清丰县| 湖北省| 宁都县| 云阳县| 界首市| 北京市| 江源县| 蓬安县| 兴安盟| 名山县| 封丘县| 叶城县| 余江县| 宜黄县| 通城县| 拉萨市| 察隅县| 乐清市| 珲春市| 永城市| 南召县| 剑阁县| 拉孜县| 买车| 铜陵市| 益阳市| 客服| 古交市| 安塞县| 丹寨县| 枣阳市| 民和| 自贡市| 当涂县| 商丘市| 化州市| 厦门市| 南丹县| 咸阳市| 驻马店市| 上杭县| 久治县| 兴化市| 梁河县| 安陆市| 都江堰市| 民和| 孟津县| 平湖市| 昌江| 连云港市| 荥阳市| 常熟市| 江陵县| 绥滨县| 昆山市| 诏安县| 嘉义县| 雅安市| 固安县|