男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
USEUROPEAFRICAASIA 中文雙語Fran?ais
China
Home / China / China

Beijing to shut coal-fired boilers to clean up air

By Zheng Xin | China Daily | Updated: 2013-05-27 07:08

Beijing to shut coal-fired boilers to clean up air

Workers with the Beijing District Heating Group destroy two coal delivery channels with cranes on April 25, marking the beginning of the transformation of energy from coal to gas in the last coal-burning power plant in Beijing. Cheng Ning / for China Daily

Beijing has vowed to eliminate most coal-fired boilers in the city center by the end of 2015 to reduce pollution from fine particulate matter, especially during the heating season.

After reducing coal use by 700,000 metric tons last year, the capital plans to cut another 1.4 million tons this year and use no more than 21.5 million tons, according to the 2013 coal consumption reduction plan released by the city's Environmental Protection Bureau and Commission of Development and Reform.

The capital used 26.35 million tons of coal in 2010, the environmental bureau said.

Beijing still has a large number of coal-fired central heating boilers that give off large amounts of coal dust, and noise during the heating season.

Richard Saint Cyr, a family medicine doctor at United Family Health in Beijing, said he has noticed an uptick in discussions about the worsening air quality with many patients since winter.

He said that air pollution in the past winter was unusually serious and he had never witnessed such collective anxiety in Beijing.

Fine particulate matter poses a serious threat to people's hearts and lungs, he said.

Shang Wenchao, 28, a lifelong Beijing resident, said he used to clean his nostrils before going to sleep in winter because the air he breathed was filled with soot from burning coal.

"You have to wear a mask every day while outdoors or you would be eating coal," he said.

Shang said the situation is much better now, but the pollution is still worse in the winter because of the coal-fired boilers.

In response, the city's Environmental Protection Bureau is taking action has said it will replace coal-fired boilers within the Fourth Ring Road with clean energy by the end of 2015.

All coal-fired boilers with a capacity of generating 20 tons of steam per hour and above will be replaced with clean energy by the end of 2015, it said.

The last five coal-fired boilers at Shougang Machinery Co's heavy machinery branch in the Shijingshan district were shut down in March, making Shijingshan the third city district without coal-powered heating, after Xicheng district and Dongcheng district.

zhengxin@chinadaily.com.cn

Editor's picks
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 河津市| 敦煌市| 临夏县| 南阳市| 永靖县| 开鲁县| 葫芦岛市| 佛冈县| 江口县| 牟定县| 高青县| 岐山县| 余姚市| 上林县| 通道| 泰和县| 小金县| 晋城| 奎屯市| 莲花县| 突泉县| 历史| 扶沟县| 江西省| 绥滨县| 射洪县| 东山县| 连平县| 锦州市| 乌拉特后旗| 岳阳市| 喀什市| 竹北市| 斗六市| 滦平县| 许昌市| 平乐县| 西盟| 公安县| 柘城县| 临邑县| 什邡市| 临朐县| 平山县| 德安县| 清镇市| 兴义市| 桦川县| 新邵县| 临高县| 喀喇沁旗| 湖南省| 东城区| 武邑县| 武宁县| 光泽县| 克东县| 客服| 南川市| 原阳县| 鹤壁市| 崇义县| 应用必备| 抚州市| 宝坻区| 新干县| 延安市| 漳浦县| 宜良县| 沈丘县| 眉山市| 中西区| 新乐市| 日喀则市| 新丰县| 霍城县| 清远市| 三亚市| 大田县| 施甸县| 铁力市| 孟村|