POWERCHINA's investment covers hydropower, wind power, thermal power, solar power, waterworks, etc.more

Hydropower

Updated: 2013-06-27

POWERCHINA has funded a number of power projects, such as the Heihetang, Shuanghe, Qinglong, Sichuan Leshan Shawan, Yadu, Liuping, Dajinping, Hongyi, and Maoergai hydropower stations, and Gansu Huating Thermal Power Plant, and holds shares of Yellow River Suzhi, Meiguhe Liuhong, Bailongjiang River Zilanba hydropower stations. The total installed capacity of POWERCHINA’s hydropower investment is 107,10 MW,among which 3570 MW is available for use, 1590 MW under construction; and 5550 MW at the preliminary study stage.

Hydropower

Hunan Taoyuan Hydropower Station, with a total installed capacity of 180 MW and an estimated total investment of 2.69 billion RMB, is under construction. The project gained governmental approval in August 2010. The first cofferdam was enclosed on Nov 17, 2012, and the second cofferdam on Oct 2, 2012. The first generator unit will be put into production in 2013.

Hydropower

The Heihetang Hydropower Station, on the lower reaches of the Heihe River, a primary tributary of the Baishuijiang River, in Sichuan province, has two units with a total installed capacity of 80 MW. The entire project is put on line in December 2006.

Hydropower

The Shuanghe Hydropower Station, on the upper reaches of the Baishuijian River, Sichuan Province, has three units and a total installed capacity of 81 MW. The entire project was put on line in June 2009.

Hydropower

The Qinglong Hydropower Station, on the main stream of the Baishui River, Sichuan Province, has three units and a total installed capacity of 102 MW. The entire project was put on line in July 2012.

Hydropower

The Nuozu Hydropower Station, on the middle reaches of the Nanpanjiang River’s main stream, has an installed capacity of 3 × 25 MW. The construction work began in December 2005; and the entire project was put on line in July 2009.

Hydropower

The Fenghuanggu Hydropower Station, on the lower reaches of the Nanpanjiang River, has a total installed capacity of 100 MW. The project was put on line in July 2009.

主站蜘蛛池模板: 通化市| 普洱| 德令哈市| 手游| 边坝县| 通海县| 郯城县| 西乡县| 龙海市| 慈溪市| 射洪县| 富蕴县| 沧州市| 个旧市| 崇义县| 淮滨县| 汉寿县| 鄂尔多斯市| 仁布县| 屏山县| 灵山县| 平顺县| 屯昌县| 富阳市| 含山县| 建瓯市| 江油市| 凯里市| 花莲市| 汽车| 玉门市| 手游| 县级市| 上栗县| 万盛区| 调兵山市| 和林格尔县| 吉隆县| 江阴市| 巴东县| 虹口区| 崇左市| 平罗县| 汝州市| 富宁县| 呼伦贝尔市| 竹北市| 绥滨县| 丹棱县| 长寿区| 龙川县| 南投县| 堆龙德庆县| 若羌县| 依安县| 平泉县| 武鸣县| 米易县| 正阳县| 伊金霍洛旗| 区。| 阿拉尔市| 界首市| 岳西县| 百色市| 山丹县| 鹿泉市| 铁岭县| 仙居县| 井冈山市| 莎车县| 息烽县| 彩票| 保定市| 迁安市| 峨眉山市| 定边县| 资源县| 万荣县| 南宁市| 大足县| 铁岭县|