男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影

Alexis Hooi

Taming the building beast within

By Alexis Hooi (China Daily)
Updated: 2010-06-26 07:42
Large Medium Small

Two weeks ago, I visited one of the most beautiful areas in the country's western region. Deep in a lush green valley, Kazak herdsmen grazed their sheep and cattle. A glacier-fed river roared next to the road as snow-capped mountains towered before a deep-blue sky.

But most of the Chinese travelers on our minibus seemed indifferent to the breathtaking scenery - until they spotted an enormous bridge under construction ahead.

The suspended structure, looming about 20-stories high, was set to link the two sides of the valley and significantly reduce traveling time to the local scenic spots. Nearby residents would also stand to gain from better transport and a faster provision of supplies.

So it was understandable that my fellow travelers whipped out their digital cameras and clicked away at the uncompleted bridge, accompanying their shots with exclamations of awe and admiration.

The Chinese people seem to have a considerable urge to tame nature with monumental building projects in a bid to improve their lives.

The Great Wall itself stands as an epitome of Chinese engineering, winding through the mountain ranges of northern China centuries after its construction.

In more recent times, other herculean feats of Chinese building include the Three Gorges Dam spanning the mighty Yangtze River and the South-to-North Water Diversion Project, which aims to feed the country's drought-prone northern areas with water from the resources-rich south.

Launched in 1993, the Three Gorges project mainly includes a 185-meter-high dam and 32 generators. The world's largest hydroelectric undertaking has already generated about 367 billion kWh since its first generator was put into operation in July 2003.

But more than 1 million people have been relocated to make way for the dam, with at least 54 billion yuan ($8 billion) designated to facilitate the relocation and rehabilitation of the people.

The authorities point to geographic hazards which threaten the project's reservoir area. Nearly 4,000 new sites are potentially in danger because of water accumulation and rainfall, latest reports from local authorities show. Bank erosions and landslides threaten the area, too.

Still, the immediate cost of the water diversion project is considered to be more than twice the investment in the dam.

   Previous Page 1 2 Next Page  

主站蜘蛛池模板: 伊金霍洛旗| 南陵县| 梁山县| 交城县| 连山| 浏阳市| 应用必备| 清河县| 台州市| 沁阳市| 五莲县| 绩溪县| 林西县| 阿荣旗| 应用必备| 桐梓县| 大英县| 赤峰市| 壤塘县| 饶阳县| 麟游县| 荆州市| 泽普县| 永德县| 敦煌市| 许昌县| 莱芜市| 文山县| 昌江| 天全县| 三原县| 兴宁市| 武隆县| 宜良县| 福鼎市| 河津市| 乌拉特前旗| 邹平县| 石景山区| 延庆县| 梓潼县| 凉山| 东光县| 洪泽县| 琼中| 北京市| 磐石市| 密山市| 东安县| 五指山市| 镇远县| 元阳县| 池州市| 昆山市| 邮箱| 定安县| 瓦房店市| 巴林左旗| 宝丰县| 绥德县| 郧西县| 赞皇县| 宁远县| 昌平区| 沂南县| 临夏市| 聊城市| 蓝山县| 巩留县| 额尔古纳市| 遂平县| 保山市| 石首市| 岱山县| 柞水县| 南岸区| 崇信县| 榆社县| 平顺县| 盈江县| 贵溪市| 财经|