男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
 
 
 
Home> News

Freight rail tunnel breaks through early

( China Daily )

Updated: 2018-05-28

Freight rail tunnel breaks through early

Welders work on supporting structures inside the Dazhongshan Tunnel earlier this month in Sanmenxia, Henan province. [Photo by China Daily]

Workers on Sunday morning completed the digging of a tunnel for the world's longest heavy-freight railway-which will stretch from coal-rich northern China to the country's central provinces-five months ahead of schedule, the project contractor said.

The 14.5-kilometer Dazhongshan Tunnel is being built in Sanmenxia, Henan province, by Shanghai Civil Engineering Co, a subsidiary of China Railway Engineering Corp.

It is an essential part of the Inner Mongolia-Jiangxi Railway coal freight project, which is 1,837 km long and expected to carry about 200 million metric tons a year from the Inner Mongolia autonomous region and Shaanxi and Gansu provinces to central China, including Hubei, Hunan and Jiangxi provinces.

Construction of the railway began in 2015, with total investment expected to reach about 190 billion yuan ($29.7 billion). It will run through seven provinces and regions, with work scheduled to be completed in October next year.

The railway will help optimize the country's distribution of energy resources. Coal resources in the north can be used to provide energy for the provinces of central China, said Zhang Guijun, the project's manager.

"With its economic value and standardized construction, the railway will be a new brand of Chinese railway after it goes into operation," he said.

Zhang Lin, chief engineer for the Dazhongshan Tunnel project, said building the railway is a massive challenge, as the route crosses the Yellow River twice, as well as the Yangtze River and complex mountain ranges.

The tunnel is in Sanmenxia's mountainous Lushi county.

"Most of it is 80 to 500 meters from the surface. The deepest point is 710 meters," Zhang said. "Digging the tunnel has been hard and risky."

He said workers came across 12 geological faults, endured temperatures of up to 50 C and experienced water bursts, but no one died because of the project's high degree of mechanization and careful planning.

Zhang said the team had also worked hard to protect the environment. Lushi county is an important water resource for the middle line of the South-North Water Diversion Project.

Wang Zhibing, another chief engineer, said the company processed more than 400,000 cubic meters of excavated rock and used it in construction.

The team also tried to help poverty-stricken local families by drilling several water wells and hiring local residents to work on the project, he added.

Copyright ? 2013 China Daily
All Rights Reserved
Sponsored by Sanmenxia Municipal Government
Powered by China Daily

主站蜘蛛池模板: 玉田县| 延吉市| 喀喇| 海丰县| 兴城市| 中阳县| 大兴区| 台北市| 隆尧县| 固阳县| 乡宁县| 固安县| 裕民县| 茶陵县| 赤壁市| 武夷山市| 陆丰市| 子长县| 酒泉市| 新宾| 涞源县| 柳州市| 芜湖市| 安泽县| 贡觉县| 吴桥县| 廉江市| 郧西县| 祁门县| 巫山县| 旅游| 彰化市| 交口县| 大庆市| 河南省| 蓝田县| 绵竹市| 安康市| 永顺县| 内江市| 潮州市| 临沧市| 灌阳县| 木兰县| 广宗县| 平和县| 永年县| 柘城县| 伊通| 齐齐哈尔市| 故城县| 灵丘县| 黑山县| 土默特左旗| 平舆县| 古交市| 怀柔区| 玉山县| 察哈| 胶南市| 凯里市| 新巴尔虎左旗| 鄂伦春自治旗| 阿城市| 龙井市| 德阳市| 松溪县| 比如县| 乌兰察布市| 安远县| 荆州市| 绥滨县| 石屏县| 泸溪县| 阿城市| 天气| 益阳市| 古交市| 临洮县| 寿阳县| 青阳县| 青川县|