男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Global EditionASIA 中文雙語Fran?ais
China
Home / China / Top News

Trans-Asian Railway construction on track

By YANG WANLI/LI YINGQING | China Daily | Updated: 2018-03-17 07:37
Share
Share - WeChat

Yunnan province will speed up construction of the Trans-Asian Railway within the province and aims to complete a railway network connecting China with Vietnam, Laos and Myanmar.

"Our goal is to build a modern railway network that could connect the provincial capital, Kunming, with the bordering nations in five hours and neighboring provinces within eight hours," said Wang Gengjie, general manager of China Railway Kunming Group Co.

Yunnan, in Southwest China, is the center of the Trans-Asian Railway, which is a project to create an integrated freight railway network across Europe and Asia.

As a deputy to the 13th National People's Congress, Wang revealed during the two sessions that all the construction work connecting China with Vietnam, Laos and Myanmar is speeding up and expected to be finished by 2021.

Under the current plan, the cross-border railway network will mainly serve freight trains for commercial trade, according to Wang.

The Kunming-Hekou Line connecting Yunnan's capital to the border with Vietnam now has two types of train tracks with different gauges.

The one-meter-wide single track, which matches the track size in Vietnam, has been used for decades and now serves freight trains.

In 2014, the bureau adopted new technology to successfully transform the track size into a wider one, and the one-meter-wide old track still can be used.

The wider track increased the train speed and cut the traveling time from Kunming to Hekou from 18 hours to only six.

"The cargo capacity improved from about 270 metric tons to nearly 4,000 tons with the technology. It has boosted economic development both at home and abroad," Wang said.

Construction of the China-Laos Line, the 414-kilometer railway linking Kunming and Vientiane, the capital of Laos, is underway and the line will begin operation by 2021, according to Wang.

Wang said the other two lines-the Dali-Lincang Railway and the Dali-Ruili Railway-aiming to connect with Myanmar and other Southeast Asian countries are also under construction.

In addition, construction of the two lines' shared part-the 200-kilometer-per-hour Guangtong-Dali railway-is expected to be completed in July this year, Wang said.

According to Wang, the designed operating speed of railways linking those three countries varies from 120 to 200 km/h.

Contact the writer at yangwanli@chinadaily.com.cn

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 阿拉善右旗| 西贡区| 吉隆县| 东丰县| 竹山县| 闽清县| 崇左市| 惠州市| 灵丘县| 铁岭市| 天峻县| 秦皇岛市| 寿光市| 保康县| 娱乐| 株洲县| 蒙阴县| 义马市| 饶河县| 溧阳市| 洛阳市| 邵武市| 潞城市| 油尖旺区| 河池市| 和龙市| 常德市| 临漳县| 会东县| 玉树县| 新邵县| 潼南县| 神农架林区| 东莞市| 泊头市| 景东| 阿拉善右旗| 庆城县| 城口县| 拜泉县| 晋州市| 高陵县| 香河县| 孟州市| 青海省| 寿光市| 都兰县| 晴隆县| 莫力| 罗城| 丰宁| 惠州市| 阳江市| 永善县| 长岭县| 陈巴尔虎旗| 房山区| 北海市| 陇川县| 滨州市| 深水埗区| 宁海县| 修武县| 博客| 新郑市| 乌兰浩特市| 九龙城区| 大方县| 始兴县| 固阳县| 易门县| 景洪市| 页游| 綦江县| 武山县| 新昌县| 淮安市| 宁明县| 深州市| 恩平市| 会昌县| 克山县|