男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
USEUROPEAFRICAASIA 中文雙語Fran?ais
China
Home / China / Innovation

High-speed rail trips get easier as network expands

By Luo Wangshu | China Daily | Updated: 2017-09-11 08:10

High-speed rail trips get easier as network expands

A high-speed train heads to Ulanqab from Hohhot in the Inner Mongolia autonomous region in August, marking the openning of the region's first high-speed railway. [Tang Zhe/For China Daily]

At major transfer hubs, passengers no longer need to exit, re-enter gate

Passengers can now reach most of China's major cities by bullet train, thanks to a network that includes linkages of a number of rail routes, as well as efficient major transfer hubs.

According to China Railway Corp, the national rail operator, direct high-speed train services have been arranged between cities with a large number of passengers, including Beijing-Kunming, Harbin-Shanghai and Chengdu-Guangzhou. Those direct services link big cities in different regions by taking more than one rail route.

Service between Dalian, Liaoning province, and Xi'an, Shaanxi province, involves eight high-speed rail routes that link 18 medium-size and large cities.

Running the network is no easy task. A high-speed rail route must not only carry out bullet train services running only on a single line but also on multiple lines.

High-speed rail trips get easier as network expands

Source: China Railway Corp

The major transfer hub design allows easy transfers to other bullet trains. Passengers can make travel plans and buy connected tickets in advance. When they arrive at the transfer station, they can use a transfer gateway to board the next service, with no need to exit the gate and enter again. The major transfer hub design offsets the lack of direct service in some areas, providing more convenient travel choices.

Lanzhou West station, the major transfer hub linking the Xinjiang Uygur autonomous region with the rest of China, is expected to receive more than 5,000 transfer passengers a day, said Wang Jian, the deputy head of the station. The Baoji-Lanzhou rail route opened in July, and Wang estimates daily passengers will reach 25,000. The route links Lanzhou with the high-speed rail network.

No direct service links Xinjiang with most cities beyond Lanzhou. A passenger from Beijing can take a direct service to Lanzhou and then transfer at Lanzhou West station to Xinjiang.

China's high-speed rail network has surpassed 20,000 kilometers, spanning all provincial level regions except Tibet and the Ningxia Hui autonomous region. Hub cities are scattered around the country and linked by the high-speed network.

The world's longest high-speed rail service in operation is the 2,760-kilometer Beijing-Kunming service, according to China Railway Corp. Beijing has a distinct spring, summer, fall and winter, whereas Kunming has been called "the spring city" because the weather never gets very cold.

Like the Beijing-Kunming service, departure and arrival cities are different, requiring a different model of bullet train to adjust to diverse local environment.

In the northeastern region's winter, when the lowest temperature can hit -40 C, bullet trains need to adjust. In the northwest region's deserts, featuring strong winds and sandstorms, such as along the Lanzhou-Xinjiang line, bullet trains have stormproof designs.

According to a plan released by the National Development and Reform Commission in July 2016, China will expand the high-speed rail network to 30,000 km by 2020, linking 80 percent of major cities. By 2030, the network will link all cities with populations of more than 500,000.

Previous 1 2 Next

Editor's picks
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 鄂托克前旗| 新化县| 峡江县| 侯马市| 泌阳县| 电白县| 栖霞市| 辽源市| 祁阳县| 曲阜市| 隆尧县| 临颍县| 金乡县| 平果县| 阳谷县| 衢州市| 斗六市| 铜陵市| 石泉县| 绩溪县| 香格里拉县| 余干县| 兴安盟| 康定县| 田阳县| 泰州市| 浏阳市| 北安市| 铜山县| 临高县| 堆龙德庆县| 托克逊县| 红桥区| 石嘴山市| 东兰县| 正镶白旗| 班戈县| 绥中县| 庆云县| 茌平县| 获嘉县| 迭部县| 东丰县| 乌兰浩特市| 巴青县| 桃江县| 蒲江县| 丽江市| 湛江市| 泰宁县| 卢湾区| 柳州市| 屏东县| 大宁县| 葫芦岛市| 元朗区| 岳阳县| 西宁市| 烟台市| 贵溪市| 万安县| 砀山县| 禄劝| 腾冲县| 巴楚县| 扶绥县| 廉江市| 鹿邑县| 舞阳县| 黔江区| 行唐县| 甘德县| 新兴县| 宿迁市| 安岳县| 赞皇县| 兴安盟| 宿迁市| 清水河县| 治县。| 沅江市| 纳雍县|