男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
         |Home|About Hebei|Government|Business|Opening up|Travel|Culture| Site Search 中文
Integrated development projects in Hebei call for bids
2010-07-26

22. The Land Consolidation for the South Section of Zirancheng District, Xingtai City

I. Project Content:

The project is located in the north of Tuanjie East Street in Qiaodong Zone, in the south of Zirancheng Residential District, and in the east of Pingan Road, covering an area of 25.6 mu. The removal and rebuilding area is about 14800 square meters. Public construction of 30,000 square meters can be built including 6,000 square meters for stores along the street.

Ⅱ. Investment Estimation and Financing:

It is estimated to invest 18.46 million dollars, including 8.79 million dollars for the removal and rebuilding funds. The fund is raised by the enterprise itself and investment. I

II. Market Analysis

The project is located in the north of Tuanjie East Street, with Zirancheng Residential District and several other districts, Kaiyuan Temple Historical and Cultural Park, the eco-park of 10 000 mu and high-speed railway station around. With the developed traffic and the complete supporting facilities, the project has a great prospect.

Ⅳ. Construction Conditions

The project is located in the south of Zirancheng which is under construction. Jixing Real Estate Development Co., Ltd. which is an affiliated enterprise of Housing Support and Public Housing Administration in Xingtai is in charge of the development and the construction of the project and it is also responsible for the removal and rebuilding and "three connections and one leveling" of the sites, assuring that a construction site is connected to water and electric power supplies and roads, and that the ground is leveled before a project is begun. Then the project follows the marketing approaches.

V. Benefit Analysis

This project together with the planned hotel in the second stage of Zrancheng project constitutes a commercial zone of 240 meters along Tuanjie East Street. After the completion of the project, this area will become the premier business center of Qiaodong Zone in our city. The total investment of the project is about 18.46 million dollars, and after the deduction of the development costs, the project benefits are estimated to be about 3 million dollars.

VI.Cooperation Mode:

Joint venture or cooperation

VII. Liaison

Contact Person: Gao Libo, Project Management Office Xingtai City, Housing Support and Public Housing Administration, Xingtai Address: No. 88 Zhonghua Street, Xingtai Tel / Fax: 86-319-2255198 E-mail: fgxiangmuban@163.com

23. New Century Business District in Xingtai City

I. Project Content:

The project is located in the north and east parts of New Century Plaza, the south of Ximenli Street. Public buildings are going to be built.

Ⅱ. Investment Estimation and Financing:

The total investment of the project is estimated at about 52 million dollars, all from foreign investments or attracting foreign investment proportionately in the form of the limited companies. Land-use rights is to be obtained in accordance with the relevant State regulations.

III. Market Analysis

1. New Century Plaza, as the largest city square in Xingtai, was built in the late 1990s. It is not only an important place for public recreation, but also a large-scale venue for events organized by the city, with the obvious aggregation effect and living room effect. In addition, according to the overall plan for Xingtai, the New Century Square area is defined as the "urban core" of the old city, and it is the business center for the old city.

2. New Century Plaza is located in intersection of Zhongxing East Street and the Xinhua Road, less than a kilometer from the railway station. New Century Business District takes New Century Plaza as the center, on the north and east of which an enclosure shape is formed. The location is extremely advantageous.

 3. New Century Business District has a better topographical condition, with the terrain height difference not normally exceeding 1 m. Most of the buildings are floor houses. There are some commercial buildings, such as hotels, banks along Xinhua North Road. In the east of New Century Plaza, there is Sanlian Hotel and some public buildings.

4. Government Preferential Policies: The development and construction of New Century Business District enjoy the preferential policies for the reconstruction of the old city in Xingtai.

IV. Planning Conditions

1.Planning Requirements:

(1) the total land used for roads outside the red line is about 4.586 hectares;

(2) the height of the main building around the New Century Plaza building should be no lower than than 50 m;

(3)the density for the buildings within the planned land should not exceed 35%; the total floor area ratio should not be greater than 2.8; the ratio of green space should not be less than 25%.

(4) 70 motor vehicle parking spaces and 140 non-motor vehicle parking spaces should be arranged in the north of Sanlian Hotel as the parking lot for the hotel. The parking for the project itself should be carried out in accordance with relevant regulations.

2. Planning Ideas:

(1) following the comprehensive plan and the local regulations for the city, and making a proper use of the historical and cultural buildings in Chongli Street.

(2) undertaking business office, finance insurance, leisure and entertainment functions, and properly configurating the residence;

(3) creating a beautiful "living room" for the city environment, enhancing the city image, promoting the development of the old city, creating a unique and comfortable urban space, achieving the unity of the economic, social, environmental benefits.

V.Cooperation Mode:

Joint venture or cooperation

VI. Liaison

Contact Person: Wang Xiaoshi, the deputy director of Urban and Rural Planning Bureau in Xingtai and chief engineer Tel :86-319-2261038 86-13785960901 Fax :86-319-2261001 E-mail: redsword@163.com Address: No.88 Zhonghua Street, Xingtai

24. Quannan Business District of Xingtai City

I. Project Content:

The project is located in the east of Road, in the south of Quannan Street, in the west of Yejin North Road and in the north of Tuanjie Street. There is open space and a small number of low buildings on the site. The commercial public buildings are to be built to create a commercial sub-center.

Ⅱ. Investment Estimation and Financing:

The total investment is 172 million dollars with the foreign investment of 100 million dollars. Land-use rights are to be obtained in accordance with the relevant State regulations.

III. Construction Conditions

The site is mainly open space now. Except Aimin Road, the other urban roads have been completed. Quannan Street already have a business base, with Baolongcang supermarket in the east, Wanchengxintiandi business center in the west, Yangguang International commercial street in the center, Yangguang International Community in the opposition and Yangguang International Mueum across the road. It is 900 m away from the largest open park (Dahuoquan Park) in the city and in the surroundings, top-grade uptowns, hospitals, primary and middle schools and other public facilities are available. Now it is a proper time to develop Quannan Street, and there is a huge pential.

IV. Planning Conditions

(A) planning land use

① The plot is an enclosure of Aimin Road, Quannan Street, Yejin North road and Tuanjie Street, covering an area of 19.53 hectares (about 293 mu): 17.70 hectares (about 265.5 mu) for commercial land, 1.83 hectares (about 27.5 mu) for urban public green space.

② land properties: commercial land, urban public green space.

(B) requirements for planning and design

① the functions of the buildings: These buildings are mainly used for commercial and business finance, culture and entertainment as well as fitness and entertainment.

② the height of the buildings: The major building should be no lower than 48 meters

③ exploitation intensity: The density of all buildings on the plot should not be greater than 50%; the total floor area ratio should not be larger than 30 000 square meters / hectare; the rate of green land is not less than 20%; the main passageway of the base is to Quannan Street.

④ The building control lines concession from the boundary lines of roads building spacing, air defense and so on should refer to relevant the existing provisions of the state and "Urban Planning and Management Techniques in Xingtai City ".

V.Cooperation Mode:

Joint venture or cooperation

VI. Liaison

Contact Person: Wang Xiaoshi, the deputy director of Urban and Rural Planning Bureau in Xingtai and chief engineer Tel :86-319-2261038 86-13785960901 Fax :86-319-2261001 E-mail: redsword@163.com Address: 88 Zhonghua Street, Xingtai





 
About Hebei  
More
Opening Up  
More
Culture  
More
Hot Topics  
More
Info   Special

Zhongmao Haiyue Hotel
 
Copyright 2009 Hebei China All Rights Reserved
 
The Official Website of the Hebei Government
Sponsored by Hebei Provincial Government
Constructed by Chinadaily.com.cn
主站蜘蛛池模板: 新宾| 平乐县| 镇安县| 高雄市| 辽阳县| 海口市| 康保县| 嘉善县| 百色市| 深水埗区| 博罗县| 瑞丽市| 开阳县| 深泽县| 马龙县| 白山市| 兰溪市| 张家界市| 那曲县| 新宁县| 博爱县| 辽宁省| 成都市| 新平| 繁峙县| 临城县| 老河口市| 股票| 湾仔区| 普陀区| 东兰县| 溧水县| 东宁县| 嘉鱼县| 红桥区| 东乌| 同德县| 阿克| 永昌县| 淮南市| 宿州市| 天台县| 宜州市| 彰武县| 绿春县| 阜新市| 黔西县| 阜阳市| 新兴县| 昌宁县| 西昌市| 惠州市| 金堂县| 高邑县| 尚义县| 曲松县| 龙井市| 抚松县| 奈曼旗| 沾益县| 兴宁市| 柯坪县| 祁门县| 渭南市| 桐庐县| 古交市| 舟山市| 井陉县| 晋城| 屏东县| 石景山区| 蒙城县| 马公市| 黄平县| 桂平市| 孟州市| 永济市| 来安县| 安塞县| 乌拉特前旗| 静宁县| 子长县|