Home / Our Business / Equipment Installation

Equipment Installation

CGGC is capable of installing turbo-generator units, electrical and auxiliary equipment of four 1,000MW hydropower projects simultaneously and its business covers various types of turbines such as Francis, axial-flow, pumped storage, tubular, and Pelton.

In the Three Gorges Project, CGGC created a world record of installing and putting into operation four large units (700MW each) within one year; in recent years, CGGC has installed over 50% of China’s total hydropower capacity, and is the established leader in hydropower unit installation in China and even the world.

 

Electromechanical Equipment Installation in the Three Gorges Water Conservancy Project (China)

In the Three Gorges Project, CGGC installed and put into operation four units (700MW each) within just one year, creating a world record.

Read more

 

Electromechanical Equipment Installation in the Gezhouba Water Conservancy Project (China)

In the installation of Gezhouba Water Conservancy Project, CGGC created national records in three aspects: annual installed capacity, annual installed number of units and installation progress, and was thus awarded the National Science & Technology Progress Prize.

Read more

 

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.

Read more

 

Electromechanical Equipment Installation at the Xiluodu Hydropower Station (China)

With a total installed capacity of 13860MW, the Xiluodu Hydropower station is currently China's second largest and the world's third largest hydropower station.

Read more

 

Electromechanical Equipment Installation at the Shuibuya Hydropower Station (China)

CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.

Read more

 

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

CGGC is the prime contractor for the four generator units at the Geheyan Hydropower Station, each having a single-unit capacity of 300MW.

Read more

 

Electromechanical Equipment Installation at the Longtan Hydropower Station (China)

CGGC was responsible for installing three homemade units (Nos. 5, 6 and 7 units) in the first phase of Longtan Hydropower Station Project.

Read more

 

Electromechanical Equipment Installation at the Pubugou Hydropower Station (China)

For the Pubugou Hydropower station, CGGC installed two of the six units and the entire utility system.

Read more

 


   Previous 1   

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

主站蜘蛛池模板: 衡阳县| 永春县| 名山县| 白沙| 莒南县| 嵊泗县| 柯坪县| 霞浦县| 吉隆县| 横峰县| 汉中市| 凉城县| 仲巴县| 富源县| 亚东县| 巢湖市| 彰武县| 临沂市| 柘荣县| 朔州市| 青川县| 长宁县| 庐江县| 兰州市| 上虞市| 五家渠市| 米脂县| 临沭县| 武功县| 金乡县| 罗定市| 青海省| 新昌县| 化隆| 青浦区| 景德镇市| 青冈县| 栖霞市| 黑龙江省| 忻州市| 锡林浩特市| 合肥市| 黄大仙区| 大冶市| 饶阳县| 都昌县| 邵武市| 泸西县| 米脂县| 渝北区| 平安县| 济阳县| 漳浦县| 永城市| 阿坝县| 永顺县| 当阳市| 上饶市| 伊金霍洛旗| 张北县| 道真| 大新县| 慈利县| 措勤县| 威海市| 明水县| 连州市| 泽普县| 九江县| 武夷山市| 鄯善县| 兴隆县| 昌平区| 吉隆县| 文登市| 安阳县| 镇宁| 贵港市| 乐昌市| 和田市| 定安县| 鄯善县|