Home / Our Business / Equipment Installation

Equipment Installation

CGGC is capable of installing turbo-generator units, electrical and auxiliary equipment of four 1,000MW hydropower projects simultaneously and its business covers various types of turbines such as Francis, axial-flow, pumped storage, tubular, and Pelton.

In the Three Gorges Project, CGGC created a world record of installing and putting into operation four large units (700MW each) within one year; in recent years, CGGC has installed over 50% of China’s total hydropower capacity, and is the established leader in hydropower unit installation in China and even the world.

 

Electromechanical Equipment Installation in the Three Gorges Water Conservancy Project (China)

In the Three Gorges Project, CGGC installed and put into operation four units (700MW each) within just one year, creating a world record.

Read more

 

Electromechanical Equipment Installation in the Gezhouba Water Conservancy Project (China)

In the installation of Gezhouba Water Conservancy Project, CGGC created national records in three aspects: annual installed capacity, annual installed number of units and installation progress, and was thus awarded the National Science & Technology Progress Prize.

Read more

 

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.

Read more

 

Electromechanical Equipment Installation at the Xiluodu Hydropower Station (China)

With a total installed capacity of 13860MW, the Xiluodu Hydropower station is currently China's second largest and the world's third largest hydropower station.

Read more

 

Electromechanical Equipment Installation at the Shuibuya Hydropower Station (China)

CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.

Read more

 

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

CGGC is the prime contractor for the four generator units at the Geheyan Hydropower Station, each having a single-unit capacity of 300MW.

Read more

 

Electromechanical Equipment Installation at the Longtan Hydropower Station (China)

CGGC was responsible for installing three homemade units (Nos. 5, 6 and 7 units) in the first phase of Longtan Hydropower Station Project.

Read more

 

Electromechanical Equipment Installation at the Pubugou Hydropower Station (China)

For the Pubugou Hydropower station, CGGC installed two of the six units and the entire utility system.

Read more

 


   Previous 1   

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

主站蜘蛛池模板: 中江县| 商水县| 莱阳市| 姜堰市| 棋牌| 山西省| 皋兰县| 澄迈县| 南雄市| 梁山县| 大荔县| 广德县| 武隆县| 唐海县| 顺昌县| 浏阳市| 饶平县| 民权县| 原阳县| 孝感市| 吉木乃县| 林甸县| 当阳市| 绥中县| 十堰市| 昔阳县| 岳西县| 始兴县| 威远县| 昌黎县| 滦南县| 且末县| 托克逊县| 辽源市| 洛川县| 惠安县| 孟连| 长治市| 大名县| 泸水县| 沿河| 宿松县| 获嘉县| 荥经县| 朔州市| 长垣县| 双辽市| 衢州市| 三穗县| 秭归县| 迭部县| 五华县| 乐亭县| 三原县| 嵊州市| 临夏市| 炉霍县| 巴林右旗| 临西县| 宁阳县| 古丈县| 宜良县| 布拖县| 郁南县| 邢台县| 遵义市| 兴仁县| 班戈县| 郎溪县| 页游| 德格县| 湖州市| 浑源县| 沾益县| 永靖县| 郧西县| 玉山县| 布拖县| 深圳市| 临澧县| 罗甸县| 吉水县|