男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
Global EditionASIA 中文雙語Fran?ais
China
Home / China / Hot Issues

Railway safety investigation delivers findings

By Zhao Ruixue in Jinan | chinadaily.com.cn | Updated: 2023-11-25 00:16
Share
Share - WeChat

Investigation results released on the official website of the National Railway Administration on Friday have shown that there is no evidence of shoddy work or corners being cut in the construction of the Lairong high-speed railway, which connects Laixi in Qingdao and Rongcheng in Weihai, both in Shandong province.

Although some threaded piles of the railway did not reach the design length, they were embedded in a good bearing layer, which did not compromise the quality and safety of the composite foundation, the investigation observed. It also noted that there were no quality issues or safety hazards with the composite foundation, and this did not affect the safe operation of the railway.

Tests show that the railway met requirements for track smoothness at a speed of 350 kilometers per hour and met the safety and stability requirements for high-speed train operation.

In July, media outlets reported that there were quality issues in the construction of the railway, including questions about threaded piles not reaching the design length, and the participating units did not follow design change procedures.

Following the reports, a joint investigation team consisting of professionals from the Shanghai Railway Supervision Administration and the Shandong Provincial Transportation Department was swiftly formed to investigate the issues.?

The investigation team organized more than 120 professionals from across the country and sought technical guidance from 10 experts in railway and geology.

The investigation found that when the pile length did not reach the design length, but the pile end entered the bearing layer. The constructors only held on-site meetings for confirmation, but failed to follow the specified procedures for design changes.

Sanjie Industrial Co, a subcontractor for drilling poles, and China Construction Eighth Engineering Division Corp, the main contractor, had conflicts concerning construction progress and engineering payment, according to the investigation.?

Sanjie withdrew from the construction in June 2021, and the two companies have not resolved the dispute. The investigation also revealed issues with on-site management and improper subcontracting in construction management.

Regarding issues related to design changes, construction management and engineering subcontracting, the Shanghai Railway Supervision Administration imposed administrative penalties on the relevant responsible units and seven individuals.

In addition, 10 individuals from companies participating in construction, supervision and design received disciplinary punishment, it said.?

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 石泉县| 清远市| 甘谷县| 盐山县| 新龙县| 铁岭市| 安吉县| 托克逊县| 宝应县| 广平县| 赫章县| 莆田市| 宜宾县| 红桥区| 定兴县| 肥乡县| 宁晋县| 海淀区| 苏尼特左旗| 城口县| 江津市| 云梦县| 满城县| 南溪县| 崇礼县| 余江县| 横山县| 呼伦贝尔市| 鹿泉市| 阳城县| 南澳县| 胶南市| 利津县| 拜泉县| 贵港市| 夏津县| 大宁县| 西安市| 衢州市| 虞城县| 隆昌县| 延庆县| 九台市| 屯昌县| 泸水县| 会同县| SHOW| 九龙城区| 顺义区| 杂多县| 兴国县| 顺平县| 涟源市| 高阳县| 奉节县| 衡水市| 得荣县| 南开区| 成都市| 无为县| 名山县| 古交市| 栖霞市| 陵川县| 喀喇沁旗| 淄博市| 芷江| 龙江县| 苏州市| 大化| 剑阁县| 绩溪县| 托克托县| 兰坪| 甘孜县| 察哈| 信阳市| 澳门| 天峨县| 泽州县| 扎赉特旗| 吉安市|