男女羞羞视频在线观看,国产精品黄色免费,麻豆91在线视频,美女被羞羞免费软件下载,国产的一级片,亚洲熟色妇,天天操夜夜摸,一区二区三区在线电影
 

Home / Press/ News

Pakistan Jinnah Hydropower Station connects to the grid

Updated: 2013-10-12

On Oct 9 the CEEC-constructed Pakistan Jinnah Hydropower Station was connected to the power grid, with all of its eight generating units put into commercial operation.

Read more

 

Main work of the largest U-shaped water delivery project completed

Updated: 2013-10-07

On Sep 28, the No.54 section of Tuanhe Aqueduct of the middle line of the South-to-North Water Diversion Project, which is the world's largest U-shaped water delivery aqueduct that is undertaken by CGGC, was completed, 90 days ahead of the schedule.

Read more

 

CGGC wins the project of Wudongde spillway tunnel

Updated: 2013-10-07

On Sep 29, CGGC won the construction project of section I of the civil construction and installation of metal structure of the spillway tunnel of Wudongde Hydropower Station.

Read more

 

CGGC-undertaken Blue Mountain Tunnel Project wins praise

Updated: 2013-09-26

On Sep 16, Raphael Boveda Bonia, the minister of the Strategic Coordination Ministry, and Walt Solis, the minister of the Ministry of Resources, inspected the Blue Mountain Tunnel Renovation Project untaken by CGGC.

Read more

 

CEEC wins Nepal Zhongbaitaike Hydropower Station EPC contract

Updated: 2013-09-23

On Sep 20 CEEC was awarded the EPC contract for civil engineering and metal structure of Nepal Zhongbaitaike Hydropower Station, with a contract value of $90.78 million.

Read more

 

Boiler installation starts for largest Iraqi Oil/Gas Fired Power Plant

Updated: 2013-09-17

On Sep 15 Baghdad time, the first steel structure of No.1 boiler of the Salah Al-Din 2*630 MW Oil/Gas Fired Power Plant was successfully hoisted and positioned in place.

Read more

 

CEEC hands over 181 low-income settlement houses in Angola

Updated: 2013-09-12

181 low-income settlement houses in Malanju province were completed by CEEC and handed over to the owner on Sep 9 after passing acceptance inspection.

Read more

 

Parit Baru Coal Fired Power Plant construction commences

Updated: 2013-09-07

A groundbreaking ceremony was held on Sep 5 in Bengkayang district, West Kalimantan province, Indonesia, to celebrate the commencement of construction of Parit Baru Coal Fired Power Plant.

Read more

 

No.3 generator unit of Vietnam Haiphong Power Plant connects to the grid

Updated: 2013-09-05

On Aug 30, the CEEC-designed No.3 generator unit of Phase-2 project of Vietnam Haiphong Power Plant was put into operation and connected to the grid.

Read more

 

CEEC begins to repair Dunai Dam in Angola

Updated: 2013-09-05

Aug 28 saw the commencement of CEEC-contracted repair of the Dunai River Dam in Benguela province, Angola.

Read more

 


   5    >>|

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

主站蜘蛛池模板: 怀安县| 普兰店市| 许昌县| 铁岭县| 阿城市| 临沭县| 河西区| 水城县| 宁武县| 宁明县| 高陵县| 江城| 碌曲县| 昭平县| 石首市| 渝中区| 纳雍县| 铅山县| 福贡县| 南通市| 蓝山县| 保山市| 井陉县| 洪雅县| 且末县| 林芝县| 舟山市| 乌兰察布市| 抚顺县| 长岛县| 马尔康县| 隆昌县| 衡南县| 昌图县| 东兰县| 明水县| 道孚县| 奈曼旗| 建平县| 灌南县| 宁安市| 宁海县| 全南县| 思南县| 红原县| 当阳市| 赣州市| 鹰潭市| 西宁市| 垣曲县| 元朗区| 崇义县| 舞钢市| 阿图什市| 如皋市| 钟祥市| 延安市| 东源县| 伊宁市| 江口县| 聂拉木县| 营山县| 古浪县| 佛坪县| 蓝山县| 平阳县| 青海省| 峨眉山市| 丰镇市| 武穴市| 台安县| 黄石市| 县级市| 祁连县| 白朗县| 和田县| 新郑市| 达州市| 克拉玛依市| 尼勒克县| 封开县| 麟游县|